Operate demolition material crushing plants

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPCCDE3021A, 'Operate demolition material crushing plants'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Operate demolition material crushing plants' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1

Plan and prepare.

1.1

Compliance requirements relevant to crushing and screening plant operations are accessed and applied.

1.2

Work requirements are obtained using relevant information, confirmed and applied to planning and preparation.

1.3

Work health and safety (WHS) requirements are followed according to safety plans and policies.

1.4

Plant and equipment are selected to carry out tasks that are consistent with job requirements and checked for serviceability, and faults are rectified and reported before work begins.

1.5

Environmental requirements are identified for the project according to environmental plans and regulatory obligations.

1.6

Crushing plant pre-start, start-up, run and shut-down procedures are conducted to ensure correct operational condition according to manufacturer requirements, and faults are identified and corrected or reported to supervisor.

1.7

Work area and equipment are prepared and sequence of tasks is planned in coordination with relevant personnel.

2

Operate crushing plant.

2.1

Operating technique is selected and modified to meet changing work conditions according to workplace and environmental requirements and manufacturer recommendations.

2.2

Uncrushed materials are directed into hopper, and feed of uncrushed materials is maintained according to manufacturer instructions.

2.3

Operations are monitored, conducted and controlled within the equipment limitations and while communicating with relevant personnel, to maintain crushing and screening efficiency and effectiveness.

2.4

Crushing plant is stopped, cleared of blocked materials and restarted as required, according to manufacturer instructions and site safety plan.

2.5

Crushing plant settings are maintained according to manufacturer instructions.

2.6

Work is completed according to requirements and within the operating capacity of the allocated equipment.

3

Carry out post-operational procedures.

3.1

Plant and equipment are inspected and faults are reported according to workplace and manufacturer requirements.

3.2

Operational maintenance, servicing, lubricating and housekeeping tasks are conducted according to manufacturer requirements.

3.3

Operational records and reports are maintained and processed according to workplace requirements.

3.4

Crushing plant is shut down according to manufacturer instructions and site safety and operation plan.

4

Clean up.

4.1

Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.

4.2

Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.


Qualifications and Skillsets

CPCCDE3021A appears in the following qualifications:

  • CPC30413 - Certificate III in Demolition