Safely handle and use scaffolding tools and equipment

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPCCSC2001A, 'Safely handle and use scaffolding tools and equipment'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Safely handle and use scaffolding tools and equipment' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan and prepare.

1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.

1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.

1.3. Signage and barricade requirements are identified and implemented.

1.4. Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults or concerns regarding quality requirements are rectified or reported prior to commencement.

1.5. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

1.6. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.

2. Handle, sort and stack scaffolding equipment and associated tools.

2.1. Tools and equipment are safely and effectively used according to manufacturer recommendations and state or territory OHS requirements.

2.2. Scaffolding equipment is moved to specified location, applying safe manual and mechanical handling techniques.

2.3. Scaffolding equipment is sorted to suit material type and size, and stacked for ease of identification and retrieval for task sequence and job location in accordance with job specifications.

2.4. Scaffolding equipment and associated tools are protected against physical, chemical, environmental and water damage and stored clear of access ways, for ease of identification, retrieval and distribution.

3. Prepare for mechanical handling of materials.

3.1. Scaffolding equipment is stacked/banded for mechanical handling in accordance with the type of material and plant or equipment to be used.

3.2. Scaffolding equipment is loaded, unloaded, moved or located at specified location assisting the forklift driver, rigger and dogman.

3.3. Scaffolding equipment and tools are safely handled with mechanical lifting devices.

4. Clean up.

4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.


Qualifications and Skillsets

CPCCSC2001A appears in the following qualifications:

  • CPC30411 - Certificate III in Demolition
  • CPC30911 - Certificate III in Scaffolding
  • CPC30411 - Certificate III in Demolition
  • CPC30911 - Certificate III in Scaffolding
  • CPC30413 - Certificate III in Demolition