Apply fasteners and fixings

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPCCSI2007A, 'Apply fasteners and fixings'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Apply fasteners and fixings' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan and prepare work.

1.1. Quality assurance requirements of signage operations are recognised and adhered to.

1.2. Safety (OHS) requirements are in accordance with application tasks and workplace operations recognised and adhered to.

1.3. Job requirements are identified from drawings, specifications, instructions and client briefs.

1.4. Specifications, drawings and instructions interpreted and job requirements and sequence, determined.

1.5. Tools and equipment and materials are selected to carry out tasks consistent with job requirements.

1.6. Substrates are identified and prepared in accordance with planned material application.

1.7. Material safety data sheets (MSDS) are referred to as required.

2. Assess substrate and material to be fastened or fixed and apply fasteners and fixings.

2.1. Substrate is assessed for its compatibility with fasteners and fixings proposed to fix sign.

2.2. Material is assessed for its compatibility with proposed fasteners and fixings to be used.

2.3. Purpose of materials to be fastened or fixed is identified and assessed for tolerances.

2.4. Fasteners and fixings are applied according to manufacturer specifications.

3. Clean up finished sign.

3.1. Sign and surrounding surface environment/area are cleaned and waste materials are removed in accordance with statutory and regulatory authority requirements.

3.2. Tools and equipment, including personal protective equipment, are cleaned, maintained and stored.


Qualifications and Skillsets

CPCCSI2007A appears in the following qualifications: