Design and size heated and cold water services and systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPCPWT4011B, 'Design and size heated and cold water services and systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Design and size heated and cold water services and systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1

Prepare for planning.

1.1

Nature and scope of planning task are identified and confirmed.

1.2

Work health and safety (WHS) andenvironmental requirements associated with planning, sizing and documenting the layout of heated, tempered and cold water services and systems are adhered to throughout the work.

1.3

Work is organised and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authorities’ requirements.

1.4

Tools and equipmentrequired for planning, sizing and documenting the layout of heated, tempered and cold water services and systems, including personal protective equipment, are selected and checked for serviceability.

1.5

Work area in which planning process is to be conducted is prepared.

2

Identify system requirements.

2.1

Information and specifications for required work are obtained and confirmed, if necessary by site inspection using relevant information.

2.2

Regulations and Australian standards relevant to the work are consulted and applied to all aspects of the work.

2.3

Quantity, location and type of take-off points and fixtures are determined from plans and specifications.

2.4

Heated, tempered and cold water services and systems are sized according to relevant Australian standards and regulatory authorities' and workplace requirements.

3

Plan service and system layout.

3.1

Layout of heated, tempered and cold water services and systems to point of discharge are planned according to building plans, relevant Australian standards and workplace procedures.

3.2

Materialsrequired are specified and optimised according to relevant Australian standards from the proposed design.

3.3

Plans are recorded according to regulatory authorities' and workplace requirements.

3.4

Sustainability principles and concepts are observed when preparing for and undertaking work process.

4

Restore work area.

4.1

Work area is restored according to workplace procedures.

4.2

Tools and equipment used in the process are refurbished and left according to workplace procedures.

4.3

Documentation, including work backup, is completed according to workplace requirements.


Qualifications and Skillsets

CPCPWT4011B appears in the following qualifications:

  • CPC40912 - Certificate IV in Plumbing and Service
  • CPC50612 - Diploma of Hydraulic Services Design