Install passive fire and smoke containment systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPPFES3040A, 'Install passive fire and smoke containment systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install passive fire and smoke containment systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1

Apply rules and regulations to installation operations.

1.1

Requirements of relevant rules and regulations are confirmed and applied to work procedures.

1.2

Compliance requirements are checked and action is taken according to organisational policies and procedures.

2

Prepare for system installation.

2.1

Work permits are obtained prior to entering customer premises.

2.2

Customer requirements are discussed and a suitable passive fire and smoke containment system is selected according to organisational and customer requirements.

2.3

Relevant measurement processes are applied to installation site and passive fire and smoke containment system components.

2.4

Components, tools, equipment and materials required for installation are identified and assembled.

2.5

Fireproofing or fire-stopping materials required for installation of system are identified and assembled.

3

Prepare fireproofing substrate or fire stopping opening for the system.

3.1

Structural or penetrated elements are checked for compliance with required smoke resistance or fire resistance level.

3.2

Fireproofing substrate or fire stopping opening is prepared.

3.3

Materials for installation of fireproofing or fire stopping system are measured and prepared.

4

Install passive fire and smoke containment system.

4.1

Fireproofing material or fire stopping system is installed according to manufacturers’ installation instructions.

4.2

Passive fire and smoke containment system is inspected and tested for defects and checked to ensure that installation is sound and aesthetically pleasing, according to standard testing procedures and acceptable workmanship.

4.3

Impediments are rectified and reported according to organisational requirements.

5

Label or mark and certify passive fire and smoke containment system.

5.1

Installation is assessed and labelled or marked according to provisions of relevant Australian standard and manufacturer, Building Code of Australia (BCA) and organisational requirements.

5.2

Relevant schedule of evidence of compliance set out in relevant Australian standard or logbook is completed according to relevant Australian standard, and organisational and customer requirements.

6

Complete installation.

6.1

Customer premises are left in a clean and tidy condition on completion of installation functions.

6.2

Documentation is completed and distributed according to organisational and customer requirements.


Qualifications and Skillsets

CPPFES3040A appears in the following qualifications:

  • CPP30811 - Certificate III in Fire Protection Inspection and Testing