Implement landfill rehabilitation plans

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPPWMT4056A, 'Implement landfill rehabilitation plans'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Implement landfill rehabilitation plans' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1

Organise for rehabilitation of landfill site.

1.1

Environmentalmanagement and site development plans are reviewed to clearly identify job requirements.

1.2

Potential hazards and risks of job requirements are identified and managed, according to organisational requirements, and occupational health and safety (OHS) regulations and other legislation and codes.

1.3

Supervisory processes and checks and measures are implemented to ensure work is completed within time available.

1.4

Plant and equipment required for work are identified and accessed according to organisational requirements.

1.5

Tools and material required for work are identified and accessed according to organisational requirements.

1.6

Emergency and personal protective equipment (PPE) is selected and fitted according to job requirements, manufacturer specifications, organisational requirements and legislation and codes.

1.7

Safety barriers and signage are erected at work site to ensure safety of surrounding personnel and public, according to organisational requirements and legislation and codes.

2

Recontour rehabilitation area.

2.1

Area is recontoured so that it blends into surrounding environment or conforms to closure/rehabilitation plan.

2.2

Creation of dust is minimised by using approved earthmoving techniques.

2.3

Final landform is checked to ensure it replicates surrounding environment or conforms to closure/rehabilitation plan and environmental guidelines.

2.4

Catchment construction is determined by site and weather conditions according to closure/rehabilitation plan and environmental guidelines.

3

Profile soil.

3.1

Soil profile is constructed according to environmental guidelines that are designed to stabilise contamination of materials, soil and surrounding areas.

3.2

Materials for sub-soil are selected, taking vegetation requirements into account.

3.3

Construction of soil profile horizon is checked to ensure it emulates surrounding environment or conforms to closure/rehabilitation plan.

3.4

Landform construction is checked for completion prior to placement of final soil layer.

3.5

Soil horizon construction is checked to ensure it follows land contour to reduce water flow down slope and increase water storage capabilities.

3.6

Nutrients are added to soil according to closure/rehabilitation plan and environmental guidelines.

4

Construct drains and berms.

4.1

Drainand berm locations are pegged and constructed in appropriate locations and angles to ensure control of water flow, according to closure/rehabilitation plan.

4.2

Drain mechanisms are placed at required dimensions and appropriate catchment locations are provided for sediment according to closure/rehabilitation plan.

4.3

Erosion of drain edges is controlled through placement of appropriate drain mechanisms to reduce speed of water flow.

4.4

Erosion is reduced by placing berms at intervals according to closure/rehabilitation plan.

5

Plant flora.

5.1

Seeds, ground covering, plants and trees are planted, protected and maintained according to planting requirements and specifications.

5.2

Fertiliser is applied according to plant type, soil quality, manufacturer specifications, organisational requirements and closure/rehabilitation plan.

5.3

Planting arrangement is checked to ensure it conforms to contour of site and pattern specification as detailed in closure/rehabilitation plan.

6

Record rehabilitation activities.

6.1

Details of landfill site rehabilitation are recorded promptly and according to organisational requirements and legislation and codes.


Qualifications and Skillsets

CPPWMT4056A appears in the following qualifications:

  • CPP40911 - Certificate IV in Waste Management