Split wood products

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver FPISAW2208B, 'Split wood products'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Split wood products' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Prepare for splitting

1.1. Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to splitting wood products are identified and followed

1.2. Work order is reviewed and checked with appropriate personnel

1.3. Type and quantity of products to be split are identified and appropriate arrangements made

1.4. Equipment is selected appropriate to work requirements and checked for operational effectiveness in line with manufacturer's recommendations

1.5. Splitting process is planned in line with site procedures

1.6. Communication with others is established and maintained in line with OHS requirements

2. Split wood products

2.1. Pre start-up checks are carried out on equipment in line with site requirements

2.2. Material is fed into the equipment at the feed rate prescribed by organisational requirements

2.3. Splitting process is maintained and adjusted to produce the required quantity of product and maximise the feed rate

2.4. Splitting process is regularly checked and adjusted to maintain the desired quality and output

2.5. Unsatisfactory product is segregated or rejected and disposed of in line with site procedures and environmental requirements

2.6. Splitting process and equipment faults are recorded and reported to the appropriate personnel

2.7. Product is safely directed to storage in a designated location in line with work order requirements

3. Conduct operator maintenance

3.1. Equipment lock-out procedures are followed in line with OHS legislation and site procedures

3.2. Splitting saw is checked for blunt or damaged condition in line with site procedures

3.3. Blunt or damaged splitting equipment is identified and dealt with in line with site procedures, manufacturer's recommendations and environmental requirements

3.4. Machine area is kept clear of dust and debris in line with OHS requirements


Qualifications and Skillsets

FPISAW2208B appears in the following qualifications:

  • FPI20305 - Certificate II in Sawmilling and Processing
  • FPI20311 - Certificate II in Sawmilling and Processing