Verify compliance and conformance of prefabricated timber building systems during manufacture

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver FWPTMM5210, 'Verify compliance and conformance of prefabricated timber building systems during manufacture'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Verify compliance and conformance of prefabricated timber building systems during manufacture' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to verify prefabricated timber building systems and components

1.1 Obtain and confirm production schedule, design documentation, plans, requirements, workplace health and safety requirements and established procedures relevant to the off-site manufacturing order

1.2 Identify certification and compliance requirements for prefabricated timber building system, components, materials and in-built services from design specifications or appropriate codes and standards

1.3 Identify tolerances for material quality, physical dimensions and service connections from design specifications

1.4 Prioritise and sequence verification work according to production schedules for completion within established timeframes

1.5 Consult appropriate personnel, testers and certifiers to coordinate verification work efficiently

2. Conduct verification for compliance and conformance

2.1 Verify that connections, structural components and physical dimensions of timber framing structure are appropriate for grade, thickness, tolerances and choice of materials according to minimum specified design requirements before installation services

2.2 Verify that provisions have been made for components including hydraulics, electrical and heating, ventilation, air conditioningmechanical services and plumbing

2.3 Ensure that partition/walls or floor elements are assembled according to design specifications, local codes and standards for minimising or eliminating continuity issues in the final, installed prefabricated timber building system

2.4 Verify regulated components including fire-rated walls or fire protection systems for conformance with performance requirements of relevant codes, standards and design specifications, and ensure that damage is minimised within the manufacturing environment

2.5 Ensure that any variations of material properties or system component decided during the off-site manufacture meet performance, design specification, relevant codes and standards

2.6 Ensure that off-site installation of services conform to the appropriate local standards and are approved before delivery to the construction site

2.7 Verify completed prefabricated timber building system to ensure that delivered product is safe for manual handling and meets design specifications and regulatory requirements

3. Report verification findings

3.1 Identify and report non-compliance and non-conformance issues according to established procedures

3.2 Make recommendations for rectifying compliance and conformance issues according to established procedures

3.3 Document completion of verification work according to established procedures