Install, maintain and modify customer premises communications cabling: ACMA Lift Rule

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver ICTCBL238, 'Install, maintain and modify customer premises communications cabling: ACMA Lift Rule'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install, maintain and modify customer premises communications cabling: ACMA Lift Rule' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Work within constraints imposed by customer premises and ACMA regulatory environment

1.1 Prepare for lift cabling work according to regulatory environment, cabling environment, cable type, cable identification, termination systems, earthing and protection, records and relevant legislation, codes, regulations and standards

1.2 Identify building infrastructure that places critical constraints on cabling when undertaking typical lift cabling installation from local distributor (LD) to lift car socket

1.3 Develop strategies to manage other infrastructure in relation to cabling

1.4 Notify appropriate personnel of identified safety hazards at cabling worksite

2. Manage remote power feed

2.1 Identify and avoid risks posed by contact with remote power feeding services when performing cabling activity

2.2 Make site safe by identifying remote power feeding services that operate at above telecommunications network voltage (TNV) inside customer premises

3. Install and modify cable support, earthing and termination infrastructure

3.1 Install fixings and cable support structures of adequate strength safely and align with environment according to manufacturer’s and customer’s specifications

3.2 Secure catenary supports to building structure and tension where necessary to ensure cable weight can be carried in operating conditions with interference and safety segregation maintained, including adherence to current Australian Standards

3.3 Install protective earthing of metal work to industry standards where required

3.4 Inspect installed support structure to ensure cable will not be exposed to damage during installation and general operation

3.5 Position terminating equipment and fixing to accepted industry codes of practice, current Australian Standards and customer requirements

3.6 Inspect control cubicles, travelling cable supports, junction boxes, line isolator units, backmount and outlet layout, to ensure compliance with manufacturer’s specifications, allow adequate work space for ease of access and avoid overlaying

3.7 Segregate incoming and outgoing cables to ensure ease of access, and avoid overlaying

4. Install cables and earth wires

4.1 Install lift communications cable from LD to lift car socket

4.2 Install cables according to manufacturer's application specifications, including tension and bending stress requirements

4.3 Identify and avoid sources of possible damage to cable, including hot pipes, sharp edges, cable burn, kinks and stretching

4.4 Allow sufficient excess at cable ends to facilitate termination

4.5 Place and secure cable to maintain safety and interference segregation according to legislative and industry standards

4.6 Install cable fasteners with correct tension to prevent cable sheath damage or transmission impairment, and trim flush to prevent risk of personal damage

4.7 Install aerial cables supported by catenaries in external environment to meet minimum above ground clearances and clearances from hazardous electrical services according to current Australian Standards

4.8 Install and secure travelling cables to maintain safety and according to relevant legislative, industry and manufacturer’s standards

4.9 Install local isolation units (LIU) as required according to current Australian Standards

4.10 Install over-voltage protection devices to all cable pairs, where required, to suppress voltage surges, with devices protectively earthed and according to current Australian Standards

4.11 Protect earth wire insulation against damage with protective earths segregated according to relevant industry and legislative standards

5. Terminate and test cables and earth wires

5.1 Remove cable sheath to allow for correct termination length and without damage to underlying conductors and their insulation

5.2 Install terminating modules according to manufacturer’s specifications, ensuring cable pairs are neatly and sequentially fanned for termination

5.3 Terminate conductors according to recommended colour code sequence using appropriate termination tools in manufacturer’s specified manner

5.4 Earth cable shield, if applicable, to manufacturer’s specifications and relevant industry codes of practice, including current Australian Standards

5.5 Undertake visual inspection to confirm termination colour code sequence has been followed, prior to end to end testing of wire and pair termination integrity

5.6 Terminate earth wires with connectors recommended by manufacturer according to relevant industry codes of practice, including current Australian Standards

5.7 Maintain earth wire continuity throughout to meet interface requirements with electrical systems

5.8 Test earthing installation for continuity, insulation resistance and conductive resistance according to relevant industry standards, including current Australian Standards

5.9 Confirm compatibility of alterations with existing systems and test new work both in isolation and when integrated with existing systems

6. Inspect cable route to ensure correct separations

6.1 Inspect separations along entire cable route and rectify separations that do not comply with regulations

6.2 Install barriers to achieve separations where sufficient spatial separation cannot be met

7. Evaluate earthing needs for cable systems on customer premises

7.1 Locate existing customer earthing systems and analyse earthing needs of cable systems

7.2 Calculate upper and lower limits of resistance for variety of cable system earths using relevant cable characteristics

8. Label earthing systems

8.1 Identify label requirements for all types of earthing systems

8.2 Attach label to earthing systems according to industry regulations

9. Create or update cable plans and records

9.1 Document installation details on record sheets and plans, and store according to customer requirements

9.2 Label cable pairs clearly to provide accurate identification according to manufacturer's, industry and customer standards

9.3 Record cabling details in cable pair record books to provide accurate record according to industry codes of practice and current Australian Standards

9.4 Complete Telecommunications Cabling Advice (TCA) form

10. Monitor work activity

10.1 Maintain close supervision of cablers not holding appropriate registration for task to ensure installation and maintenance activity is strictly according to legislative requirements and industry standards for safety and network integrity, including all current Australian Standards