License to operate an advanced boiler

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver MSABLIC002, 'License to operate an advanced boiler'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'License to operate an advanced boiler' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1

Plan work

1.1

Potential workplace hazards and appropriate risk control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment

1.2

Type of boiler, with associated equipment, is identified and boiler operations planned according to procedures

1.3

Personal protective equipment is identified necessary for the work requirements

1.4

Suitable communication methods are identified and confirmed with appropriate personnel

1.5

Appropriate records are located and reviewed to prepare for boiler operation

2

Start up boiler

2.1

Risk prevention and control measures are applied to the work area according to procedures

2.2

Communication equipment is selected and inspected for serviceability

2.3

All necessary equipment is selected and inspected for operational effectiveness according to procedures, including establishing water level

2.4

Boiler and associated equipment are visually checked for any damage or defects with any found reported and recorded according to procedures with appropriate action taken

2.5

Boiler is vented to atmospheric pressure prior to start up

2.6

Pre-start up checks are carried out on the boiler and the boiler and associated equipment brought online safely according to procedures

2.7

Maintenance requirements and any visual faults are identified and reported according to procedures

2.8

Start up following maintenance and/or repairs, and associated isolations are confirmed, completed, logged and the equipment made serviceable

3

Monitor boiler operation

3.1

Operating status of the boiler and associated equipment is diagnosed

3.2

Operating log is maintained clearly and accurately according to procedures

3.3

Boiler valves, fittings, pressure gauges, combustion management systems, air heaters, super-heaters and economisers (where fitted) are monitored according to procedures

3.4

Boiler water level gauges are blown through both steam and water sides

3.5

Standby plant and equipment are tested according to procedures

3.6

Boiler water quality tests, where required, are conducted and results recorded according to procedures

3.7

Boiler water chemicals, where required, are adjusted after tests, where appropriate, according to procedures with downstream users notified if necessary

3.8

Automatic blowdown and, where required, boiler is blown down to adjust total dissolved solids (TDS) levels to recommendations

3.9

Handover information regarding boiler and associated equipment status and operation is communicated clearly to relevant personnel according to procedures

3.10

Any boiler emergency is responded to immediately in accordance with procedures

4

Shut down boiler

4.1

Boiler and associated equipment are shut down for inspection according to procedures

4.2

Maintenance requirements and any visual faults are identified and reported according to procedures

4.3

Where required, boiler and associated equipment are cleaned internally and externally to manufacturer recommendations and procedures

4.4

Isolations associated with in-service maintenance are completed according to procedures

4.5

Boiler operating log is completed for shut down

5

Store boiler in shut down mode

5.1

Storage time and condition of storage are identified, where required

5.2

Boiler and associated equipment are stored in safe condition for access in accordance with manufacturer recommendations and procedures

5.3

Stored boiler water and chemicals are tested, where required, and handled in accordance with procedures, where storage is for extended periods