Undertake helicopter winch operations

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver PUAFIR217, 'Undertake helicopter winch operations'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Undertake helicopter winch operations' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Prepare for winch–exit operations

1.1 Equipment appropriate to helicopter winch operations is selected and prepared in accordance with organisational requirements.

1.2 Appropriate clothing and equipment is selected and worn during winch operations in accordance with organisational requirements.

1.3 Pre-flight checks on clothing and equipment are undertaken in accordance with organisational procedures.

1.4 Damage to firefighting and safety equipment is reported to relevant supervisor for repair, replacement or disposal.

1.5 Pre-flight aircraft safety and winch briefings are obtained from pilot or crew person and acted upon.

2. Load winch personnel and equipment into helicopter

2.1 Firefighting equipment is assembled, weighed and recorded.

2.2 Pilot is informed of weights.

2.3 Equipment is loaded into helicopter and secured under supervision of pilot or flight crew.

2.4 Personnel are secured in seatbelts in accordance with workplace instructions.

2.5 Instructions are obtained from pre-mission briefing and clarification of objectives and procedures is sought.

2.6 Pre-flight safety briefing is obtained from pilot or flight crew.

3. Prepare to winch–exit from helicopter

3.1 Following clearance from pilot, instructions are received to prepare for exit.

3.2 Winch cable is attached and checked according to procedures.

3.3 Pre-descent checks are conducted in accordance with organisational requirements.

3.4 Seatbelt is released and then re-secured in accordance with organisational procedures and instructions received.

3.5 Movement towards the helicopter door and assumption of the winching position is undertaken in accordance with workplace instructions.

3.6 Clearance is obtained from the pilot to commence winch–exit.

3.7 Emergency procedures are conducted as required.

3.8 Emergency commands are responded to in accordance with organisational procedures.

4. Winch–exit from helicopter

4.1 Winch–exit operations are undertaken and conducted in accordance with work health and safety requirements.

4.2 Actions are undertaken to minimise uncommanded movement, spinning or swaying during descent to the ground.

4.3 Appropriate landing technique is selected and used in accordance with ground and safety conditions.

4.4 Winch equipment is detached and the all-clear signal is communicated to pilot or crew person when landing activity is complete.

4.5 Assembly point for individual/s and equipment is identified and reached in accordance with organisational procedures.

4.6 Emergency procedures are conducted as required.

4.7 Emergency commands are responded to in accordance with organisational procedures.

5. Winch on board helicopter

5.1 Individual/s and equipment are located at the nominated assembly point in preparation for winching on board.

5.2 Winching equipment is donned and attached to winch cable and all clear signal is communicated to the crew person in accordance with organisational procedures.

5.3 Actions to minimise uncommanded movement, spinning or swaying during ascent to the helicopter are undertaken in accordance with organisational procedures.

5.4 Movement on board the helicopter and towards the seat is undertaken in accordance with workplace instructions.

5.5 Seatbelts are secured until clearance is obtained to commence movement within the helicopter, in accordance with organisational safe work practices.

5.6 Winch cable is detached under instruction and handed to crew person.

5.7 Seatbelts remain secured until the helicopter has landed and clearance is obtained to commence movement within the helicopter.

6. Perform maintenance on equipment

6.1 Equipment is inspected and required maintenance is performed in accordance with organisational or manufacturer requirements.

6.2 Damage to equipment is reported to relevant supervisor for repair, replacement or disposal.

6.3 Maintenance or damage to equipment is documented and reported according to procedures.


Qualifications and Skillsets

PUAFIR217 appears in the following qualifications:

  • PUA20613 - Certificate II in Public Safety (Firefighting and Emergency Operations)
  • PUA20713 - Certificate II in Public Safety (Firefighting Operations)