Erect a temporary modular support system (bailey) on an existing bridge

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIICTB303D, 'Erect a temporary modular support system (bailey) on an existing bridge'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Erect a temporary modular support system (bailey) on an existing bridge' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1. Plan and prepare to erect a temporary modular support system (bailey) on an existing bridge

1.1. Access, interpret and apply temporary modular support system (bailey) documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions before proceeding

1.3. Confirm and apply environmental protection and safety requirements

1.4. Obtain, interpret and implement traffic management signage requirements

1.5. Select and check for faults plant, tools and equipment to carry out tasks

1.6. Identify, confirm, safely handle and locate ready for use materials required for the work application

1.7. Select and wear personal protective equipment appropriate for work activities

1.8. Identify, address and report hazards, risks and environmental issues

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and establish support system

2.1. Assess load bearing capacity of the ground and/or timber directly under the support system

2.2. Set out bearing locations

2.3. Install supplementary supports

3. Assemble temporary modular bridge

3.1. Assess condition of components for acceptable use and replace faulty parts

3.2. Compile components and check inventory

3.3. Mark location points for high capacity panelling

3.4. Select resources, materials and equipment

3.5. Sequence assembly process prior to commencement

3.6. Assemble interlocking components using connections and fittings for the temporary modular bridge

3.7. Re-check completed assembly

4. Disassemble temporary modular bridge

4.1. Sequence disassembly process prior to commencement

4.2. Select resources, materials and equipment

4.3. Disassemble interlocking components including connections and fittings

4.4. Compile components and check inventory

4.5. Assess condition of components for acceptable reuse

4.6. Store components

5. Clean up

5.1. Clear work area and dispose of or recycle

5.2. Clean, check, maintain and store machinery, tools and equipment