Assist grouting or cementing operations

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIINHB218D, 'Assist grouting or cementing operations'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Assist grouting or cementing operations' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1. Plan and prepare for assisting the grouting or cementing operations

1.1 Access, interpret and apply assist grouting or cementing operations, documentation and ensure work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Operate ancillary equipment

2.1 Start-up ancillary equipment as per manufacturers instruction

2.2 Appropriately run ancillary equipment

2.3 Shut down ancillary equipment as per manufacturers instruction

3. Perform basic measurement and calculations

3.1 Use and read tape measure accurately

3.2 Carry out simple calculations and measurements of tank capacities, casing and rod lengths

3.3 Record or complete tally sheets for number of lengths of casing placed in the hole

3.4 Record results legibly on all reports

4. Grout and cement hole

4.1 Mix grout and additives

4.2 Access, interpret and apply safety data sheets (SDS) requirements for all materials used

4.3 Apply grout/cement using appropriate techniques, and complete grouting/cementing

4.4 Avoid spillage of grout, cement or additives

4.5 Construct well head, hole identification and install hole security devices

4.6 Dispose of any excess grout or cement according to site waste management procedures

4.7 Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

5. Clean all equipment at completion of grouting or cementing

5.1 Operate cleaning equipment

5.2 Ensure that all cleaning equipment is kept in good working condition

5.3 Complete housekeeping activities

5.4 Process records


Qualifications and Skillsets

RIINHB218D appears in the following qualifications:

  • RII20913 - Certificate II in Drilling Operations
  • RII20915 - Certificate II in Drilling Operations