Construct and complete single aquifer production bores

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIINHB325D, 'Construct and complete single aquifer production bores'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Construct and complete single aquifer production bores' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1. Plan and prepare for the construction of single aquifer production bores

1.1 Access, interpret and apply single aquifer production bore construction documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Discuss scope of work with client and give technical advice, cost structure, workmanship warranty, quantity and quality of materials, construction standards and methods to be used and gain general agreement on drilling plan

1.6 Obtain or sight any licences or permits required under the relevant state/territory legislation or regulation

1.7 Communicate and coordinate activities with others throughout the work activity

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.9 Provide detailed strata logs, pump and development test results conducted during bore development and water and strata samples to the appropriate authorities

1.10 Complete all requirements for bore completion reports, decommissioning or abandonment and send to regulatory authorities within the time specified on bore licence

2. Design production bores for single aquifer systems

2.1 Determine most appropriate construction methods from the reading and interpretation of all available documented information

2.2 Design the bore to ensure the exclusion of unsuitable surface waters

2.3 Select a bore site that will prevent contamination and minimise interference with other bores and adhere to occupational health and safety requirements

2.4 Determine a drilling fluid program to suit the expected down hole conditions

2.5 Select likely water entry mechanisms from the formation to the bore such as open hole, slotted casing, screens or gravel packs

2.6 Calculate appropriate artificial gravel pack design parameters and recommended annular thickness requirements

2.7 Plot and interpret formation sieve analysis results onto graphs

2.8 Undertake calculations to determine appropriate screen/slot design parameters (i.e. diameter, length, aperture size)

2.9 Select appropriate bore/surface casing type, size, strength and wall thickness for the anticipated ground water quality and pressure conditions and any construction requirements

2.10 Ensure all necessary materials anticipated for the job are available and on site prior to commencement of construction phase

3. Construct production bores in single aquifer systems

3.1 Carry out any pre-start and start up procedures on plant or ancillary equipment

3.2 Identify, select and apply rig operational controls

3.3 Select, slot, assemble, and insert casing and screens suitable for the formations in which they are deployed

3.4 Select, mix and place grout or otherwise seal surface casing to whatever depths necessary and with a minimum grout sheath thickness of 20mm to protect bore from surface or shallow subsurface waters that may be contaminated or polluted

3.5 Use and maintain drilling fluids and additives within the manufacturer’s recommendations and that are non-toxic and capable of being completely removed from the bore upon completion

3.6 Maintain, test and record fluid properties such as viscosity, mid weight, filtration and sand content so that the potential capacity, efficiency and quality of the bore is not affected

3.7 Maintain plumbness and alignment of the hole within the required limitations and perform plumbness tests where required

3.8 Collect, store, record, label and transport formation and water samples for mechanical and/or chemical analysis

3.9 Maintain all records accurately and legibly

3.10 Accurately calculate hole, annular fill, gravel pack and mud pit volumes in cubic metres or litres

3.11 Select appropriate gravel pack or stabilising gravel fill materials

3.12 Place artificial or stabilising gravel fill if required in a manner that will ensure uniform distribution in the annular space without bridging, voids or segregation

3.13 Comply with relevant workplace occupational health and safety requirements for both the drilling equipment and construction materials

3.14 Maintain tool string inventories

3.15 Identify and protect headworks of the bore

3.16 Construct headworks to seal and cap the bore from surface water pollutants, environmental concerns (e.g. flooding), damage and vandalism

3.17 Incorporate methods for measuring static and pumping water levels in headworks and for adequate sealing when not in use

3.18 Remove drilled fluids from the bore to allow subsequent development

3.19 Dispose of/neutralise wastewater or hazardous materials from site and complete restoration of the bore site and camp facilities

3.20 Maintain tool strings and inventories

4. Develop bore

4.1 Use bore development techniques with care to prevent collapsing of casing or screens

4.2 Use development techniques to improve hydraulic transmissivity around the bore

4.3 Undertake development until a continuous, clean supply of water is obtained, in accordance with acceptable and practical limits set by site, contractual or regulatory requirements

4.4 Measure/calculate and record standing and drawdown water levels

4.5 Perform pump and development tests to estimate the sand content and sustainable yield of the bore

5. Disinfect/decontaminate bore and drilling equipment

5.1 Clean and disinfect/decontaminate drilling equipment and tools before working on new sites to comply with relevant standards or regulatory requirements

5.2 Disinfect bores and installed equipment constructed for potable supplies using chlorine or proprietary chemical solution or steam

5.3 Handle hazardous chemicals in accordance with safety data sheets (SDS)

5.4 Remove and dispose of/ neutralise any disinfecting agents from the bore upon completion

6. Carry out bore maintenance and rehabilitation

6.1 Carry out and shutdown procedures and secure equipment Undertake a process of diagnosis to determine likely cause of bore deterioration

6.2 Devise a program of rehabilitation to ensure that the bore is restored to a reasonable condition

7. Decommission test/bore holes

7.1 Determine suitable decommissioning procedures and select appropriate materials

7.2 Carry out the decommissioning (abandonment) of test holes or bore holes in single aquifer systems

7.3 Verify position/location of hole for future reference

7.4 Dispose of drill and other fluids safely

7.5 Carry out housekeeping requirements


Qualifications and Skillsets

RIINHB325D appears in the following qualifications:

  • RII31813 - Certificate III in Drilling Operations
  • RII31815 - Certificate III in Drilling Operations