Control cane traffic movements

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver SUGTCCT3A, 'Control cane traffic movements'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Control cane traffic movements' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Element

Performance criteria

1. Prepare for operation

1.1 Participate in shift handover process to identify status and occurrences affecting traffic control

1.2 Confirm status of traffic activities on the cane railway network and in the empty and full yards

1.3 Establish communication with drivers, crews and other relevant personnel

1.4 Housekeeping standards are maintained

2. Implement schedule

2.1 Train movement instructions are issued to maintain safe operations

2.2 The communication system is used to provide timely information to relevant personnel

3. Issue train clearances to maintain train separation

3.1 Clearance instructions are issued

3.2 Point-to-point clearances are issued

4. Maintain train separation

4.1 Access to the rail network is controlled, including access by drivers, navvies, contractors, harvesting crews and other third parties

4.2 Train passing is arranged and co-ordinated in accordance with workplace procedures

4.3 Transportation movements are managed using rail network procedures and systems

5. Maintain efficient running

5.1 Transport departures and arrivals are co-ordinated and adjusted

5.2 Train running times are monitored and opportunities to improve efficiency are identified and acted upon

5.3 Train loads are maximized within load limits

5.4 Train passing is managed to minimize delays and maintain safe operations

5.5 Overall operating efficiencies are monitored and optimised

6. Complete traffic control operations

6.1 Train movements and related workplace information is recorded according to workplace recording requirements

6.2 Recording systems and advice reflects accurate information at the time of handover

6.3 Handover is carried out according to workplace procedure

6.4 Traffic controllers are aware of system and related equipment status at completion of handover