MANAGE FUEL, BILGE AND BALLAST OPERATIONS PROCEDURES ON VESSELS OVER 750 KW PROPULSION POWER

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TDMMR1407B, 'MANAGE FUEL, BILGE AND BALLAST OPERATIONS PROCEDURES ON VESSELS OVER 750 KW PROPULSION POWER'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'MANAGE FUEL, BILGE AND BALLAST OPERATIONS PROCEDURES ON VESSELS OVER 750 KW PROPULSION POWER' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

.

.

1

Manage fuel and ballast operations

a

The organisation of fuel and ballast operations on a vessel between 750 kW and 3,000 kW propulsion power is carried out as per established procedures

b

Fuel and ballast operations are completed as per vessel's procedures and machinery and equipment manufacturer's instructions and specifications

c

The performance of machinery and equipment used in fuel and ballast operations is monitored in accordance with vessel's survey requirements and manufacturer's instructions and performance is compared with specifications and recommended limits of performance

d

Out of specification performance and faults are identified and appropriate action initiated to report or rectify the problem as per marine practice and procedures

e

Records of performance of equipment used in fuel and ballast operations are maintained on running sheets and operations logs as per procedures

TDMMR1407B MANAGE FUEL, BILGE AND BALLAST OPERATIONS PROCEDURES ON VESSELS OVER 750 KW PROPULSION POWER

ELEMENT

PERFORMANCE CRITERIA

2

Carry out preventative maintenance of machinery and equipment used in fuel and ballast operations

a

Preventative maintenance measures for machinery and equipment used in fuel and ballast operations are carried out in accordance with established procedures

b

Identified faults in machinery and equipment used in fuel and ballast operations are investigated using advanced diagnostic techniques in accordance with established procedures

c

Decisions are made to carry out temporary or permanent repairs depending on the vessel's position and circumstances

d

Appropriate consultation is taken with class society and marine administration concerning the nature of the repairs and any contingency or emergency action required

e

Management of the maintenance processes and the organisation and control of engine room personnel to facilitate repairs is in accordance with established procedures

3

Carry out repairs on machinery and equipment used in fuel and ballast operations

a

Malfunctioning or faulty machinery or equipment used for fuel and ballast operations is correctly shut down, and disassembled, if necessary, as per manufacturer's instructions, company procedures and established practice

b

Damaged or faulty components are repaired or replaced in accordance with established procedures

c

Repaired machinery is reassembled in accordance with manufacturer's instructions, company procedures and established marine engineering practice

d

Repaired machinery is tested and adjusted as per vessel's procedures and manufacturer's instructions and in consultation with relevant personnel

e

Performance of repaired machinery and associated safety devices, control systems and alarms is tested in accordance with manufacturer's instructions

f

Performance against recommended performance specifications is confirmed and the machinery is recommissioned in accordance with vessel's procedures

4

Complete operational and maintenance and repair documentation

a

Correct records are kept relating to fuel and ballast operations and machinery failure incidents

b

All planned maintenance system and repair documentation is completed in accordance with survey and company requirements and regulations

TDMMR1407B MANAGE FUEL, BILGE AND BALLAST OPERATIONS PROCEDURES ON VESSELS OVER 750 KW PROPULSION POWER

ELEMENT

PERFORMANCE CRITERIA

5

Follow safety and hazard control procedures

a

Fuel and ballast operations are conducted in accordance with relevant safety regulations and company procedures

b

Operational hazards for fuel and ballast operations are identified and action is taken to minimise or eliminate risk to personnel, vessel and the environment

c

Safety, hazard minimisation and pollution control procedures and national and international regulations are followed at all times during fuel and ballast operations

d

Where relevant, procedures and precautions necessary for entry into a pump-room, fuel tanks or other confined spaces on a vessel are correctly followed

e

Action is taken, in the event of a machinery failure or emergency to secure the machinery and the vessel and maintain the safety of the vessel and persons involved, and shipboard emergency and contingency plans are followed

f

Personnel are trained and organised to implement shipboard emergency and contingency plans in the event of a machinery failure or emergency

TDMMR1407B MANAGE FUEL, BILGE AND BALLAST OPERATIONS PROCEDURES ON VESSELS OVER 750 KW PROPULSION POWER


Qualifications and Skillsets

TDMMR1407B appears in the following qualifications:

  • TDM60307 - ADVANCED DIPLOMA OF TRANSPORT & DISTRIBUTION (MARINE ENGINEERING - CLASS 2)