MANAGE THE OPERATION, MONITORING AND EVALUATION OF THE PERFORMANCE OF STEAM PROPULSION PLANT ON VESSELS OF UNLIMITED PROPULSION POWER

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TDMMR5707A, 'MANAGE THE OPERATION, MONITORING AND EVALUATION OF THE PERFORMANCE OF STEAM PROPULSION PLANT ON VESSELS OF UNLIMITED PROPULSION POWER'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'MANAGE THE OPERATION, MONITORING AND EVALUATION OF THE PERFORMANCE OF STEAM PROPULSION PLANT ON VESSELS OF UNLIMITED PROPULSION POWER' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

.

.

1

Operate and maintain steam propulsion plant

a

Steam propulsion plant and auxiliary systems are managed and operated in accordance with established procedures

b

The performance of steam propulsion plant is monitored in accordance with bridge orders, company procedures, survey requirements and manufacturer's instructions and performance is compared with technical specifications and recommended limits of performance

c

The methods of measuring the operating parameters of the steam propulsion plant are in accordance with manufacturer's technical specifications

d

Poor performance and faults are identified in accordance with established marine engineering practice

e

Poor performance and faults are investigated in accordance with marine engineering practice and manufacturer's instructions and appropriate action initiated to rectify the identified problem

TDMMR5707A MANAGE THE OPERATION, MONITORING AND EVALUATION OF THE PERFORMANCE OF STEAM PROPULSION PLANT ON VESSELS OF UNLIMITED PROPULSION POWER

ELEMENT

PERFORMANCE CRITERIA

1

Operate and maintain steam propulsion plant

(continued)

f

Appropriate action is taken to prevent damage/failure in accordance with vessel's planned maintenance system or procedures, established marine engineering practice, safety regulations and manufacturer's instructions

g

Faulty and worn steam propulsion plant components are identified and are reported and action is initiated as required for repair or replacement in accordance with company procedures and established marine engineering practice

h

Decisions are made to carry out temporary or permanent repairs depending on the vessel's position and circumstances

i

Appropriate consultation is held with class society and marine administration concerning the nature of the repairs and any contingency or emergency action required

j

Management of the repair processes and the organisation and control of engine room personnel and when required shore personnel, to facilitate repairs, is in accordance with established procedures

k

Routine maintenance and survey requirements are carried out in accordance with company procedures and established marine engineering practice

2

Repair faultsin steam propulsion plant and auxiliary systems

a

Identified faults in steam propulsion plant and auxiliary systems are investigated using advanced diagnostic techniques in accordance with established procedures

b

Malfunctioning steam propulsion plant and auxiliary systems are correctly isolated and disassembled, if necessary, in accordance with manufacturer's instructions and established marine engineering practice

c

Damaged or faulty components are repaired or replaced in accordance with established procedures

d

Repaired steam propulsion plant and auxiliary systems are reassembled and checked in accordance with manufacturer's instructions and established marine engineering practice

e

Repaired steam propulsion plant and auxiliary systems are restarted and adjusted in accordance with vessel's procedures and manufacturer's instructions and in consultation with relevant personnel

f

Performance of repaired steam propulsion plant and auxiliary systems and associated safety devices, control systems and alarms is checked in accordance with manufacturer's instructions

g

Performance against recommended technical specifications is confirmed and the steam propulsion plant and auxiliary systems are recommissioned in accordance with vessel's procedures

TDMMR5707A MANAGE THE OPERATION, MONITORING AND EVALUATION OF THE PERFORMANCE OF STEAM PROPULSION PLANT ON VESSELS OF UNLIMITED PROPULSION POWER

ELEMENT

PERFORMANCE CRITERIA

3

Complete operational and performance evaluation documentation

a

Correct records are made relating to the operation and performance evaluation of steam propulsion plant and auxiliary equipment and any steam propulsion plant and auxiliary equipment failure incidents

b

All operational and performance evaluation documentation is completed in accordance with vessel's procedures, bridge orders, survey and company requirements, and regulations

4

Follow safety and hazard control procedures

a

Vessel's safety management procedures and safety regulations are applied in the operation and performance evaluation of steam propulsion plant and auxiliary systems

b

Hazards involved in steam propulsion plant and auxiliary systems operation and performance evaluation are identified and action is taken to minimise or eliminate risk to personnel, vessel and the environment

c

Safety, hazard minimisation and pollution control procedures and national and international regulations are followed at all times during maintenance and repair operations

d

Where relevant, procedures and precautions necessary for entry into a pump-room, fuel tanks or other confined spaces on a vessel are correctly followed

e

Action is taken in the event of a plant or machinery failure or emergency to secure the steam propulsion plant and auxiliary systems and the vessel and maintain the safety of the vessel and persons involved, and shipboard emergency, and contingency plans are followed

TDMMR5707A MANAGE THE OPERATION, MONITORING AND EVALUATION OF THE PERFORMANCE OF STEAM PROPULSION PLANT ON VESSELS OF UNLIMITED PROPULSION POWER


Qualifications and Skillsets

TDMMR5707A appears in the following qualifications:

  • TDM60207 - ADVANCED DIPLOMA OF TRANSPORT & DISTRIBUTION (MARINE ENGINEERING - CLASS 1)