Check conveyor operational status

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLIB907C, 'Check conveyor operational status'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Check conveyor operational status' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements and Performance Criteria

Element

Performance Criteria

1

Inspect conveyor system and work area

1.1

The conveyor equipment is checked prior to start-up in accordance with workplace procedures, manufacturers safety checks and specifications to ensure it is free from damage and obstructions that may limit operational capability

1.2

Work area is checked to ensure that it is safe and appropriate for the required task

2

Check equipment operational capability

2.1

Conveyors are inspected after start-up in accordance with manufacturers specifications and workplace inspection specifications and procedures

2.2

Warning systems are checked for operational effectiveness

2.3

Records are checked to determine maintenance history and requirements and goods carried

3

Identify, assess faults and report results of inspection and testing

3.1

Faults are identified and assessments made of the potential effect on the operation of the equipment for the required work, and details forwarded to relevant personnel in accordance with workplace procedures

3.2

Accurate reporting of the results of the inspection and testing is kept in accordance with regulatory requirements, workplace policy and industry guidelines

3.3

Clear reference is made to any items which may affect the future safety/operation of the equipment

3.4

Conveyor system is continually monitored for safe and efficient operation