Access rail track to travel track vehicle/s under block working conditions

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLIC3056A, 'Access rail track to travel track vehicle/s under block working conditions'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Access rail track to travel track vehicle/s under block working conditions' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1Plan for travel movements

1.1 Travel requirements are established and application for approval is initiated

1.2 Movements are confirmed with network control officer prior to travel to ensure adequate protection for infrastructure and track workers during travel

1.3 Pre-start briefing is conducted with track vehicle operators to clarify travel movements and their responsibilities in accordance with advertised approval and workplace procedures, as applicable

2Access track

2.1 Permission to occupy track is requested from network control officer

2.2 Appropriate personal protective equipment (PPE) is worn in accordance with access provider's and workplace requirements

2.3 Limits of travel are identified and protection of the route by network control officer is confirmed

2.4 Stand alone signalling control equipment is identified and, where required, points are operated to gain access to the track as authorised by network control officer

2.5 A situational awareness is maintained to identify local conditions and any changed circumstances

2.6 Communications with network control officer is maintained using appropriate communication protocols and systems in accordance with access providers and workplace procedures

3Travel track vehicle/s on track to worksite

3.1 Communication protocols and systems are used to coordinate the convoy, if applicable

3.2 Speed limit is maintained for type of vehicle/s and track conditions

3.3 Speed limit is varied to meet local conditions

3.4 Permission is obtained to pass signals in accordance with workplace procedures

3.5 Track vehicle is managed so as to be able to stop short of other track vehicles or obstruction on track

3.6 Stand alone signalling control equipment is identified and, where required, points are operated to establish correct direction as authorised by network control officer

3.7 Signals are identified and obeyed

3.8 If necessary, level crossing protection equipment is operated for the safe passage of track vehicle/s in accordance with workplace procedures

3.9 Unsafe situations and/or emergencies are identified and appropriate action is taken in accordance with workplace procedures

4Clear limit of travel

4.1 Network control officer is informed when track vehicle/s has arrived and is clear of limit of travel