Set up, operate and shut down a distributed power system

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLIC4073, 'Set up, operate and shut down a distributed power system'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Set up, operate and shut down a distributed power system' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare train for set up of distributed power system

1.1

Distributed motive power units are positioned as required in train consist

1.2

Hazards are identified, risks are assessed and risk control measures are implemented

1.3

Train sections are marshalled to form one train as required

2

Set up remote distributed motive power units

2.1

Distributed power is set up on all remote units

2.2

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures ready for linking with lead control unit

2.3

Startup procedures for remote distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

3

Set up lead distributed motive power units

3.1

Distributed power system is set up by conditioning/activation of required systems

3.2

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures

3.3

Startup procedures for lead distributed motive power unit are followed in accordance with manufacturer instructions and/or organisational policies and procedures

3.4

Full control of distributed motive power units is established after linking process has been completed and required function tests have been conducted

4

Operate and monitor distributed power train

4.1

Distributed power system is operated and monitored during train operation to ensure safe train handling and control in accordance with operational requirements

4.2

Operational difficulties/faults are identified and rectified ensuring operational safety and efficiency

4.3

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

5

Shut down distributed power systems

5.1

Distributed power train is secured against movement as required prior to system shut down

5.2

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures


Qualifications and Skillsets

TLIC4073 appears in the following qualifications:

  • TLI42613 - Certificate IV in Train Driving
  • TLI42615 - Certificate IV in Train Driving