Control rail traffic movement

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLIL4042A, 'Control rail traffic movement'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Control rail traffic movement' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1Monitor status of current train area plan

1.1 Actual train movements and associated activities are analysed to establish current situation

1.2 Proposed train movements and associated activities are identified to establish status of area plan in accordance with workplace procedures and policies

1.3 Circulars, telegrams and special train notices are checked for accuracy and adjustments made as required

1.4 Operational management system information is reviewed against observed status and inconsistencies corrected

2Implement the daily working timetable

2.1 Train movements are prioritised and directed in accordance with authorisations to ensure optimum and consistent running to timetable

2.2 Relevant information is communicated to internal and external customers to minimise the effect of changes

2.3 Planned train movements, circulars and special train notices are implemented using safeworking systems and requirements to ensure safety

3Control rail traffic movement

3.1 Layout, characteristics and condition of track section of responsibility is assessed for its effect on train running

3.2 Train movements are coordinated with other relevant personnel in accordance with safeworking systems and requirements and workplace policies and practices

3.3 Surveillance and alarm systems are monitored to identify emergency situations

3.4 Signalling system is operated to ensure track section of responsibility is open or closed to train pathways as required

3.5 Signalling systems are operated and monitored to ensure safe movement of traffic

4Implement contingency plans for system faults and failures, and for planned events

4.1 Contingency plan to suit the event or system failure or fault is identified and reviewed as necessary

4.2 Resources to cover the contingency are deployed in coordination with relevant personnel

4.3 Communications with event site are established

4.4 Train plan is adjusted in accordance with safeworking systems and requirements and in coordination with relevant personnel to minimise interruptions and provide alternative services

4.5 Arrangements are made to maintain communications with internal and external customers where possible

4.6 Operational management system information is updated to reflect changes resulting from plan implementation

5Update traffic movement documentation

5.1 Traffic movement documentation is receipted, compiled and recorded to provide accurate basis for train movement

5.2 Traffic movement documentation is endorsed at the completion of shift in accordance with workplace requirements to ensure accurate hand-over


Qualifications and Skillsets

TLIL4042A appears in the following qualifications:

  • TLI40410 - Certificate IV in Transport and Logistics (Rail Operations)
  • TLI40410 - Certificate IV in Transport and Logistics (Rail Operations)