Solve problems in ELV single path circuits

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEECD0042, 'Solve problems in ELV single path circuits'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Solve problems in ELV single path circuits' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to work on ELV single path electrical circuits

1.1

Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for the relevant work area are identified and applied

1.2

Hazards are identified, risks are assessed, and control measures and workplace procedures are implemented

1.3

Nature of the circuit/s problem is obtained from relevant documentation or work supervisor to determine the scope of work to be undertaken

1.4

Advice is sought from work supervisor to ensure work is coordinated effectively with others

1.5

Materials required for the work are identified and accessed in accordance with workplace procedures

1.6

Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety in accordance with workplace procedures

2

Solve ELV single path electrical circuits problem

2.1

WHS/OHS risk control work measures and procedures are followed

2.2

Need to test or measure live electrical work is determined and conducted in accordance with WHS/OHS, workplace and regulatory requirements

2.3

Circuits are confirmed as being isolated, as required, in accordance with WHS/OHS, workplace and regulatory requirements

2.4

Methodological techniques are used to solve circuit problems using measured and calculated values as they apply to single path, single source circuits in accordance with workplace procedures

2.5

Problems are solved without damage to apparatus, circuits, the surrounding environment or services using sustainable energy practices

3

Complete work and document problem-solving activity

3.1

WHS/OHS risk control measures for work completion are followed

3.2

Worksite is cleaned and made safe in accordance with workplace procedures

3.3

Justification for solutions used to solve circuit problems is documented in accordance with workplace procedures

3.4

Work completion is documented and appropriate person/s notified in accordance with workplace procedures