Evaluate performance of low voltage electrical apparatus

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEEEL0011, 'Evaluate performance of low voltage electrical apparatus'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Evaluate performance of low voltage electrical apparatus' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to evaluate electrical apparatus

1.1

WHS/OHS processes and workplace procedures for a given work area are identified, obtained and applied

1.2

WHS/OHS risk control measures and workplace procedures in preparation for the work are followed

1.3

Inspection and testing area are checked for safety hazards and risk control measures implemented in accordance with WHS/OHS and workplace procedures

1.4

Relevant documentation is obtained and interpreted to identify the certification/approval specifications of the electrical apparatus to be assessed.

1.5

Advice is sought from the work supervisor to ensure the work is coordinated effectively with others

1.6

Tools, testing devices and materials required for work are obtained and checked for correct operation and safety

2

Evaluate electrical apparatus

2.1

WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

2.2

The need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures

2.3

Circuits/apparatus/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures

2.4

Assessment process of electrical apparatus performance requirements and testing methods applied are in accordance with relevant industry standards and workplace procedures

2.5

Apparatus inspection and test methods for relevant parameter/s are prepared in accordance with workplace procedures and relevant person/s advised

2.6

Apparatus inspection and tests are carried out in accordance with workplace procedures and results documented

2.7

Unplanned situations are dealt with safely and with the approval of relevant person/s

2.8

Assessment is carried out without damage to systems circuits, environment and/or services using sustainable energy practices

3

Complete work and document evaluated results

3.1

WHS/OHS work completion risk control measures and workplace procedures are followed

3.2

Worksite is cleaned and made safe in accordance with workplace procedures

3.3

Inspection and test results are evaluated and non-compliance issues identified in accordance with workplace procedures

3.4

Inspection and test results and comments on non-compliance issues are documented and reported to relevant person/s in accordance with workplace procedures