Assemble and wire internal electrical rail signalling equipment

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEENEEN102A, 'Assemble and wire internal electrical rail signalling equipment'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Assemble and wire internal electrical rail signalling equipment' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1

Prepare to assemble and wire internal signalling equipment

1.1

OHS procedures for a given work area are identified, obtained and understood.

1.2

Established OHS risk control measures and procedures are followed in preparation for the work.

1.3

Safety hazards that have not previously been identified are noted, and established risk control measures are implemented.

1.4

Technical requirements relating to specific signalling equipment are established.

1.5

Assembly and wiring is appropriately sequenced in accordance with job schedule

1.6

Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site

1.7

Materials needed for assembly and wiring are obtained in accordance with established procedures and checked against job requirements

1.8

Tools, equipment and testing devices needed to assemble and wire equipment are obtained in accordance with established procedures and checked for correct operation and safety

2

Assemble and wire internal signalling equipment

2.1

OHS risk control measures and procedures for carrying out the work are followed.

2.2

Equipment is assembled, wired, connected and labelled to comply with technical standards and job specifications and requirements.

2.3

Established methods for dealing with unexpected situations are discussed with appropriate person(s) and documented.

2.4

Unexpected situations are dealt with safely and with the approval of an authorised person.

2.5

Equipment is assembled, wired, connected and labelled efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.

3

Complete the assembly and wiring of internal signalling equipment

3.1

OHS work completion risk control measures and procedures are followed.

3.2

All terminations are tested in accordance with appropriate testing procedures to ensure tightness and functionality.

3.3

Mandatory continuity and insulation tests are carried out at the workplace as per appropriate test procedures to ensure and verify system standards are met.

3.4

Documentations including wiring diagrams are completed to establish procedures and requirements to ensure quality and safety issues are addressed, and relevant reports produced.


Qualifications and Skillsets

UEENEEN102A appears in the following qualifications:

  • UEE30811 - Certificate III in Electrotechnology Electrician
  • UEE33011 - Certificate III in Electrical Fitting
  • UEE40611 - Certificate IV in Electrotechnology - Systems Electrician
  • UEE41211 - Certificate IV in Electrical - Rail Signalling
  • UEE43011 - Certificate IV in Electrical Equipment and Systems
  • UEE53011 - Diploma of Electrical Systems Engineering