Decommission electrical and electro-mechanical rail signalling from service

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEENEEN127A, 'Decommission electrical and electro-mechanical rail signalling from service'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Decommission electrical and electro-mechanical rail signalling from service' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1

Prepare to decommission electrical and electro-mechanical rail signalling from service

1.1

OHS procedures for a given work area are identified, obtained and understood.

1.2

Established OHS risk control measures and procedures are followed in preparation for the work.

1.3

The extent of decommissioning is determined from, job specifications, design drawings and regulatory requirements.

1.4

Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site.

1.5

Materials needed for the safe disconnection of circuits, equipment and components are obtained in accordance with established procedures and checked against job requirements.

1.6

Tools, equipment and testing devices needed to disconnect circuits; equipment and components are obtained in accordance with established procedures and checked for correct operation and safety.

2

Decommission electrical and electro-mechanical rail signalling from service

2.1

OHS risk control measures and procedures for carrying out the work are followed.

2.2

Where applicable on-track safety requirements are complied with to enterprise standards

2.3

Visual inspection is carried out and all circuits, equipment and components are checked to ensure they are in accordance with manufacturer and systems specifications.

2.4

Disconnecting work includes the isolation and removal of redundant wiring and the termination of altered wiring, checking and adjusting levels, checking indicators and system operation is carried out to organisation requirements.

2.5

Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.

2.6

Decommissioning is performed efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.

2.7

System and design faults are verified using appropriate technical information, fault finding and diagnostic techniques to identify faulty signalling equipment.

2.8

Faulty signalling equipment is replaced, adjusted and secured in accordance with manufacturer specifications and organisation procedures.

2.9

Control equipment is adjusted and tested using appropriate test procedures and equipment to ensure it operates within the specified technical parameters.

3

Complete decommissioning work and reports

3.1

OHS work completion risk control measures and procedures are followed.

System faults are identified and reported for follow-up action.

Test results are documented in accordance with organisation requirements and faulty or replaced equipment is tagged and dispatched to maintain equipment spares.