Audit energy use for commercial HVAC/R systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEERA0009, 'Audit energy use for commercial HVAC/R systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Audit energy use for commercial HVAC/R systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to audit energy use for a commercial HVAC/R application

1.1

WHS/OHS processes and workplace procedures for a given work area are identified and applied

1.2

WHS/OHS risk control measures and workplace procedures are followed in preparation for the work

1.3

HVAC/R system assessment and testing area are checked for safety hazards and risk control measures implemented in accordance with safety policy and workplace procedures

1.4

Relevant documentation is obtained and read to determine performance/certification assessment requirements

1.5

Advice is sought from the work supervisor to ensure work is coordinated effectively with others

1.6

Tools, testing devices and materials needed to carry out the work are obtained and checked for correct operation and safety

2

Audit energy use for a commercial HVAC/R application

2.1

WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

2.2

Circuits/apparatus/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures

2.3

HVAC/R system performance and energy efficiency requirements and assessment methods are applied to the audit process

2.4

HVAC/R apparatus assessment and tests are set up in accordance with established test methods and workplace procedures for each parameter being audited

2.5

HVAC/R system assessment and tests are carried out methodically and results and required actions systematically noted

2.6

Unexpected situations are dealt with safely in accordance with workplace procedures with the approval of an authorised person/s in a manner that minimises risk to personnel and equipment

2.7

Auditing is carried out without damage to systems, circuits, the surrounding environment or services using sustainable energy practices

3

Document auditing activities and results

3.1

WHS/OHS work completion risk control measures and workplace procedures are followed

3.2

Worksite is cleaned and made safe in accordance with workplace procedures

3.3

Assessment and test results are evaluated, non-compliance issues identified, and appropriate actions determined and documented

3.4

Assessment test results and recommendations on non-compliance issues are documented and reported to appropriate person/s in accordance with workplace procedures