Install and commission carbon dioxide refrigeration systems, components and associated equipment

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEERA0047, 'Install and commission carbon dioxide refrigeration systems, components and associated equipment'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install and commission carbon dioxide refrigeration systems, components and associated equipment' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to install CO² refrigeration components and associated equipment

1.1

WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied

1.2

Safety hazards not previously identified are reported, assessed and advice on risk control measures is sought from work supervisor

1.3

Nature of work is obtained from documentation or from work supervisor to determine the scope of work to be undertaken

1.4

Refrigeration component and equipment installation is appropriately sequenced in accordance with job schedule

1.5

Sources of materials required for refrigeration work are obtained in accordance with workplace procedures

1.6

Tools, equipment and testing devices needed to carry out refrigeration work are obtained and checked for correct operation and safety

2

Install CO² refrigeration system

2.1

Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures

2.2

Refrigeration components and equipment are installed in accordance with technical industry standards, job specifications and requirements with sufficient access to affect electrical and pipe work connections and maintenance

2.3

Refrigeration components and equipment are installed straight and square, in the required locations and within acceptable tolerances

2.4

Pressure testing is conducted at a pressure compatible with CO² and in accordance with industry standards

2.5

Leaks are located and rectified using testing methods appropriate to the system and in accordance with industry standards and practices

2.6

Refrigeration system is evacuated to the required level and cleaned of moisture and contaminants in accordance with industry standards and practices

2.7

Unplanned situations are responded to in accordance with workplace procedures, discussed with appropriate person/s and documented in a manner that minimises risk to personnel and equipment

2.8

Installation and tests are carried out without damage to apparatus, circuits, the surrounding environment or services and using sustainable energy practices

3

Commission CO² refrigeration system

3.1

Commissioning work is appropriately sequenced in accordance with job specification

3.2

Appropriate person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite

3.3

Extent of the system and location of system components is determined from site inspection and/ or job specifications and diagrams

3.4

System control settings and operating parameters are determined from job specifications and requirements

3.5

Tools, equipment and testing devices needed to commission a CO² refrigerant system are obtained and checked for correct operation and safety

3.6

Refrigeration system is charged safely with refrigerant grade CO² and compatible lubricants in accordance with industry standards and practices

3.7

Refrigeration actual and specified range of operating conditions are determined from measured and calculated values as they apply to CO² vapour compression and volatile secondary (liquid recirculation/cascade) system in accordance with workplace procedures

3.8

Pre-commissioning checks are undertaken to ensure components are in place and secure in accordance with manufacturer specifications and industry standards

3.9

Need to test or measure live operating CO² system is determined in accordance with WHS/OHS requirements and workplace safety procedures

3.10

CO² refrigeration system pressure controls, valves, pumps and regulators are adjusted to their required settings

3.11

Testing/measuring devices are used to observe the operation of refrigeration system and fine adjustments of controls are made as required in accordance with manufacturer specifications

3.12

Commissioning is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy practices

4

Complete work and relevant documentation

4.1

Worksite is cleaned and made safe in accordance with workplace procedures

4.2

Final check of the installed components and equipment is made to verify that it complies with relevant industry standards and job requirements

4.3

'As-installed' refrigeration components and equipment are documented and appropriate person/s notified in accordance with workplace established procedures

4.4

Commissioning results are documented and include final operating parameters of the refrigeration system