Maintain and monitor remote area essential service operations

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEERE0040, 'Maintain and monitor remote area essential service operations'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Maintain and monitor remote area essential service operations' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to maintain remote area power supply (RAPS) compound and monitor performance

1.1

Work health and safety (WHS)/occupational health and safety (OHS) requirements for a remote area power station facility are identified and applied in accordance with workplace routines and procedures

1.2

Risks are identified, assessed and control measures applied in accordance with workplace procedures prior to commencing work

1.3

Risks/hazards are identified, assessed, reported to relevant person/s and control measures implemented

1.4

Nature and location of remote area power station facility is obtained from documentation or from relevant person/s to determine the scope of work

1.5

Advice on coordinating work with others and the local community is obtained from relevant person/s and applied

1.6

Sources of materials required for work are identified and accessed in accordance with workplace routines and procedures

1.7

Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety

1.8

Defective and unsafe tools and service equipment are repaired or replaced in accordance with workplace procedures

2

Maintain RAPS compound and monitor performance

2.1

Workplace risk control measures and procedures are applied

2.2

Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures

2.2

Power station building, generating equipment and compound are cleaned and tidied to maintain a safe and efficient plant area in accordance with workplace procedures

2.3

Inspection and reporting are conducted on suitability, location and legibility of safety signage

2.4

Inspection and reporting are conducted on location, suitability and condition of firefighting equipment

2.5

Performance status and fuel and oil use of generation equipment is monitored and logged based on information obtained from instruments, meters and measuring devices

2.7

Non-routine events are referred to relevant person/s for directions in accordance with workplace procedures

2.8

Quality checks are conducted in accordance with instructions and workplace procedures

3

Develop maintenance schedule and complete work report

3.1

Workplace risk control measures and procedures are applied

3.2

Maintenance schedule is developed based on logged information on power station performance status and condition of compound

3.3

Maintenance issues beyond the scope of work are referred to relevant person/s in accordance with workplace procedures

3.4

Work completed is reported to relevant person/s in accordance with maintenance reporting and workplace procedures