Install, maintain and fault find battery storage systems for grid-connected photovoltaic systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEERE4001, 'Install, maintain and fault find battery storage systems for grid-connected photovoltaic systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install, maintain and fault find battery storage systems for grid-connected photovoltaic systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan for the installation, maintenance or fault finding of battery storage systems for grid-connected PV systems

1.1

Installation design requirements, components and how they interconnect with the different system configurations are identified

1.2

Hazards associated with battery storage systems for grid-connected PV systems are identified and the risk control measures are listed in safe work method statements/job safety analysis

1.3

Designer recommendations, relevant industry standards, regulations and manufacturer specifications are identified and applied to planning the system installation, maintenance or fault finding

1.4

Tools and safety equipment are selected and checked for safe performance of required tasks

1.5

Maintenance is planned in accordance with system designer's requirements

1.6

PV system and reported faults are identified and fault finding techniques applied

2

Carry out the installation, maintenance and fault finding of battery storage systems for grid-connected PV systems

2.1

Job safety analysis is undertaken or safe work method statement is prepared and used to inform work processes in accordance with regulations and workplace procedures

2.2

Battery storage components are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications

2.3

Inverters are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications

2.4

System charge controllers are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications

2.5

Storage system equipment including, cables, protection and isolation equipment, and signs are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications

2.6

System charge controllers and inverters are programmed in accordance with design documentation, relevant industry standards, regulations and manufacturer specifications

2.7

Required modification to the electrical installation is carried out in accordance with design documentation, regulations and relevant industry standards

2.8

Maintenance checklists are used to identify items needing servicing or replacement

2.9

Required maintenance is performed by servicing or replacing items

2.10

Fault finding techniques are applied to correctly diagnose and rectify system faults

2.11

Testing, commissioning or reinstatement of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications

3

Document the installation, maintenance or fault finding of battery storage systems for grid-connected PV systems

3.1

Testing, commissioning and required compliance documents are completed

3.2

As installed, electrical system drawings and equipment location plans are produced

3.3

Client system documentation, from designer, is completed

3.4

Client is briefed on safe and correct system operation and recommended maintenance

3.5

Maintenance checklists are finalised correctly and added to client system documentation

3.6

Fault report/record is completed and added to client system documentation