Install and maintain power-operated point actuating devices

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEERS0009, 'Install and maintain power-operated point actuating devices'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install and maintain power-operated point actuating devices' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to install/maintain power-operated point actuating device

1.1

Work health and safety (WHS)/Occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified

1.2

Hazards are identified, WHS/OHS risks are assessed, control measures and workplace procedures are implemented in preparation for work

1.3

Scope of the installation/maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements

1.4

Appropriate rail safe working personnel are consulted to ensure work is coordinated effectively with others involved on the worksite

1.5

Materials needed for the installation/maintenance are obtained in accordance with workplace procedures and checked against job specifications

1.6

Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety

2

Install/maintain power-operated point actuating device

2.1

WHS/OHS risk control measures and workplace procedures for carrying out work are followed

2.2

Installation/maintenance, cleaning, brushing and lubricating work are carried out on point actuating devices in accordance with technical and operational specifications

2.3

Adjustments to point actuating devices are made to ensure correct operation, and perway fastenings and timbers are inspected in accordance with operational specifications

2.4

Position and mounting of point actuating devices are checked in accordance with site layout and operational specifications

2.5

Installation/maintenance is performed efficiently, without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices

2.6

Function of equipment is determined from technical data, maintenance handbooks, workplace and equipment operating procedures

2.7

Faulty, worn, damaged or insecure components are replaced, repaired or secured in accordance with technical and manufacturer specifications to ensure operational effectiveness

2.8

Equipment is inspected and tested in accordance with workplace testing procedures to ensure operational and technical requirements are achieved

2.9

Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes

3

Complete power-operated point actuating device installation/maintenance

3.1

WHS/OHS work completion risk control measures and workplace procedures are followed

3.2

Documentation is completed to provide an accurate installation/maintenance record and Network Control Officer informed of work status details

3.3

Reusable, faulty or worn components are tagged and despatched for repair to maintain adequate spares

3.4

Faulty perway conditions/components are documented to provide details for corrective/follow-up action

3.5

Point actuating devices are temporarily taken out of service, instated back into service and certified in accordance with organisation requirements and workplace procedures

3.6

Maintenance work activities are recorded in accordance with organisation requirements to provide accurate records and produce relevant reports