Conduct butt fusion of large diameter polyethylene gas pipeline systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEGNSG200, 'Conduct butt fusion of large diameter polyethylene gas pipeline systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Conduct butt fusion of large diameter polyethylene gas pipeline systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to weld polyethylene pipe

1.1

Job requirements and workplace procedures for the site are discussed with relevant persons

1.2

Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental and sustainable measures for the site are identified, obtained and applied

1.3

Scope of work and responsibilities are confirmed with relevant persons in accordance with job requirements and workplace procedures

1.4

Pre-start test weld sample is prepared in accordance with workplace procedures

2

Confirm pipe handling and jointing of polyethylene pipe

2.1

Pipe and materials hazards are identified, risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

2.2

Equipment, tools and personal protective equipment (PPE) required to carry out the work are identified, obtained and checked for correct operation and safety in accordance with workplace procedures

2.3

Relevant person/s are consulted to ensure the work is coordinated effectively with others involved

2.4

Materials, plans, diagrams, drawings and resources required to weld and lay polyethylene gas distribution mains are confirmed, scheduled and obtained in accordance with workplace procedures

2.5

Unsuitable or damaged materials including improperly stored materials are rejected/rectified and reported in accordance with workplace procedures

2.6

Safety and emergency response procedures and responsibilities for an incident are checked and confirmed with relevant person/s

2.7

Site preparation, safety plan, traffic management plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures

3

Construct and weld polyethylene gas distribution mains

3.1

WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are monitored and followed

3.2

Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures

3.3

Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job requirements

3.4

Welding and laying of polyethylene gas distribution mains are conducted in accordance with relevant industry standards and workplace procedures

3.5

Materials are prepared, aligned, constrained and jointed in accordance with relevant industry standards and workplace procedures without waste

3.6

Unplanned incidents/events are referred to relevant persons for directions in accordance with workplace procedures

3.7

Welds and safety checks of work and testing of pipework is carried out in accordance with industry standards, work instructions and workplace procedures

4

Complete work and relevant documentation

4.1

WHS/OHS and environmental risk control measures for work completion are followed

4.2

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

4.3

Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures

4.4

Relevant person/s are notified of work completion in accordance with workplace procedures

4.5

Relevant documentation is completed and provided to appropriate person/s in accordance with workplace procedures