Carry out surveillance of gas transmission pipelines

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEGNSG349, 'Carry out surveillance of gas transmission pipelines'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Carry out surveillance of gas transmission pipelines' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to carry out surveillance of gas transmission pipelines

1.1

Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental, cultural and heritage measures for the site are identified, obtained and applied

1.2

Job requirements and workplace procedures for the surveillance work are discussed with relevant person/s to confirm the work schedule

1.3

WHS/OHS, environmental and sustainable energy policies and procedures are obtained and communicated to relevant person/s

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures

1.5

Hazards are identified, WHS/OHS and environmental risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

1.6

Scope of work and level of responsibility under the relevant work authorisation/permit/ notification is obtained and confirmed with relevant person/s in accordance with workplace procedures

1.7

Plant, equipment, tools and personal protective equipment (PPE) required for gas pipeline surveillance work are identified, obtained and checked for correct operation and safety in accordance with workplace procedures

1.8

Communication issues with relevant stakeholders are resolved and work coordinated in accordance with workplace procedures

1.9

Person/s participating in the work are briefed and responsibilities confirmed in accordance with workplace procedures

1.10

Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures

2

Carry out surveillance of gas transmission pipelines

2.1

WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out work are followed

2.2

Relevant materials, tools, equipment and measuring devices are selected and used correctly and safely in accordance with workplace procedures and manufacturer instructions

2.3

Dealings with customers are consistent with workplace procedures and the special needs of customers are identified and considered in targeting client service

2.4

Ground surveillance work is carried out to the required standard, without waste of materials or damage to apparatus, equipment, and the surrounding environment or services using sustainable energy principles

2.5

Leakages and damaged pipes, structures, systems and fittings are recorded in accordance with workplace procedures

2.6

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks and incidents are assessed and reported to authorised person/s for directions in accordance with established procedures

2.7

Unplanned events in the pipeline surveillance work are dealt with in accordance with level of responsibility and workplace procedures

2.8

System breaches, faults and operational conditions of the pipeline network are identified and resolved, where possible, and reported to relevant person/s in accordance with workplace procedures

2.9

Pressure and flow fluctuations outside of acceptable limits are investigated and resolved, where possible, and reported to relevant person/s in accordance with workplace procedures

2.10

Key issues are identified, solutions/options developed, implemented and communicated to relevant stakeholders in accordance with workplace procedures

2.11

Quality checks of the work are undertaken in accordance with job instructions and workplace procedures

3

Complete work and relevant documentation

3.1

WHS risk control work measures for work completion are followed

3.2

Work area is tidied and made safe in accordance with workplace procedures

3.3

Tools and equipment are cleaned, checked and securely stored in accordance with workplace procedures

3.4

Relevant person/s are notified of work completion, non-conformances and proposed solutions/options are reported in accordance with workplace procedures

3.5

Relevant records, reports and documentation are completed, processed and provided to appropriate person/s in accordance with workplace procedures


Qualifications and Skillsets

UEGNSG349 appears in the following qualifications:

  • UEG50114 - Diploma of Gas Supply Industry Operations
  • UEG60114 - Advanced Diploma of Gas Supply Industry Operations