Install cathodic protection systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEGNSG412, 'Install cathodic protection systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install cathodic protection systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan installation of cathodic protection system

1.1

Work schedule/s, job requirements, drawings, plans and maps are identified and examined to identify the cathodic protection system installation in accordance with workplace procedures

1.2

Job requirements and workplace procedures for the work are identified for all work sites and communicated to all relevant person/s

1.3

Relevant work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental and sustainable energy policies and procedures are obtained, applied and communicated to relevant person/s

1.4

Data from completed cathodic protection surveys is analysed and work prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures and industry standards

1.5

WHS/OHS risk control measures for identified hazards are prioritised, implemented and monitored against the work schedule in accordance with workplace procedures

1.6

Relevant work permit/s are obtained to access and perform the installation work, in accordance with job requirements, workplace procedures and industry standards

1.7

Technical specifications and drawings are prepared from the analysed cathodic protection survey data and approved in accordance with job requirements and workplace procedures

1.8

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures

1.9

Communication is established with relevant stakeholders to carry out the installation work in accordance with work schedule and workplace procedures

1.10

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

1.11

Third-party issues are referred to appropriate person/s in accordance with workplace procedures

1.12

Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures

1.13

Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plans

2

Install cathodic protection system

2.1

WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures

2.2

Hazardous activities are conducted safely in accordance with workplace procedures and job requirements

2.3

Approved specifications and drawings are reviewed and the cathodic protection system installed in accordance with the work schedule, workplace procedures and industry standards

2.4

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

2.5

Unplanned events and non-routine problems in the installation are identified and actioned in accordance with workplace procedures

2.6

Fault-finding and troubleshooting techniques are applied to identify any problems with the installation in accordance with job requirements and workplace procedures

2.7

Quality and safety checks of the work are conducted in accordance with job requirements, industry standards and workplace procedures

3

Test and commission cathodicprotectionsystem and complete relevant documentation

3.1

Installed cathodic protection system and components are commissioned and tested for conformance and anomalies reported in accordance with regulatory requirements and workplace procedures

3.2

Accidents, injuries and non-conformances are reported, as required, in accordance with workplace procedures

3.3

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

3.4

Tools, equipment and any surplus resources and materials are cleaned, checked and stored in accordance with workplace procedures

3.5

Relevant work permit/s are signed off and equipment is returned to service in accordance with job requirements and workplace procedures

3.6

Cathodic protection system is tested and adjusted, additional survey data collected, and work completion records and documentation completed, processed and appropriate person/s notified in accordance with workplace procedures

3.7

As built/as installed drawings are checked, updated and returned to the relevant cathodic protection engineering person/s in accordance with workplace procedures


Qualifications and Skillsets

UEGNSG412 appears in the following qualifications:

  • UEG50114 - Diploma of Gas Supply Industry Operations
  • UEG60114 - Advanced Diploma of Gas Supply Industry Operations