Coordinate Electrical Energy Production

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEPOPS438A, 'Coordinate Electrical Energy Production'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Coordinate Electrical Energy Production' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1

Plan for plant operation

1.1

Safety issues are identified to comply with enterprise/site requirements

1.2

Work, plant and resource requirements are identified from relevant information and documentation

1.3

Pre-operational checks are carried out in accordance with enterprise and site requirements

2

Operate generator and excitation system

2.1

System is operated in accordance with enterprise/site and manufacturer's operating procedures

2.2

Synchronising requirements are assessed, evaluated and achieved to ensure machine/system stability during synchronising

2.3

System is monitored and observed to detect deviations from normal operating conditions

2.4

Corrective actions are taken to rectify abnormalities in accordance with manufacturer's and enterprise/site procedures

2.5

Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training

3

Control generation of electrical energy

3.1

Generator output is adjusted to meet demand whilst observing operating requirements

3.2

Reactive power generation and voltage regulation requirements are assessed and the system is controlled to achieve the desired output

3.3

Generator stabilities and operating limits are assessed and the system is controlled to maintain those limits in accordance with enterprise/site and manufacturer's procedures

3.4

Generator cooling systems and limits are monitored and assessed, excitation system is controlled to maintain those limits in accordance with enterprise/site and manufacturer's procedures

4

Coordinate unit operations

4.1

Systems are operated to meet requirements whilst observing plant limitations

4.2

Systems are monitored and observed to detect deviations from normal operating conditions

4.3

Causes of abnormal operating conditions are identified by analysing the technical and operational information

4.4

Corrective actions taken to rectify system abnormalities are in accordance with enterprise and site requirements

4.5

System integrity, personnel safety and continuity of supply are maintained throughout

4.6.

Consultation with appropriate personnel is undertaken as required in accordance with site requirements

4.7

Systems are operated at optimum efficiency.

5

Monitor system/plant

5.1

System/plant to be monitored is physically identified

5.2

System/plant is monitored for normal operation or to detect deviations

5.3

Corrective action taken is in accordance with enterprise/site procedures

5.4

Appropriate personnel are notified when defects and abnormal operating conditions are detected

6

Test system/plant operation

6.1

Tests are performed in accordance with defined procedures applicable to the operational test

6.2

System/plant is observed for correct operational response

6.3

Correct action is taken when response is not in accordance with documentation, plant/system integrity or personnel safety requirements

6.4

System/plant is returned to required operational status upon completion of test

7

Analyse system/plant faults

7.1

Causes of abnormal system operating conditions are identified by analysing the technical and operational information in a logical and sequential manner

7.2

Actions necessary to rectify fault are correctly determined

7.3

System/plant integrity and personnel safety are maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation

7.4

Appropriate personnel are arranged for local investigation of identified operational abnormalities

8

Complete documentation

8.1

Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures