Assessor Resource

ICPPRN242
Produce basic pad printed product

Assessment tool

Version 1.0
Issue Date: April 2024


This unit describes the skills and knowledge required to safely operate a pad printing machine ensuring efficient routing production flow that maintains product quality standards.

It applies to individuals working in the printing and graphic arts industry who perform a range of mainly routine tasks, work under direct supervision and use limited practical skills and knowledge in a defined context.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Maintain routine pad printing process

1.1 Location of objects into fixtures is monitored and adjusted if necessary

1.2 Printing plate condition is monitored to ensure quality of printed product meets the approved proof standard

1.3 Printing pad condition is monitored and maintained to ensure quality of printed product meets the approved proof standard

1.4 Spatula and doctor blade are monitored and adjusted to ensure quality of printed product meets the approved proof standard

OR

1.5 Ink cup is monitored and adjusted to ensure quality of printed product meets the approved proof standard

1.6 Printing ink viscosity is monitored and adjusted to ensure quality of printed product meets the approved proof standard

2. Maintain manual pre- and post-treatments

2.1 Manual loading is monitored and adjusted to ensure quality of printed product meets the approved proof standard

2.2 Manual pre-treatment is monitored and adjusted to ensure quality of printed product meets the approved proof standard

2.3 Drying racks are monitored and adjusted to ensure quality of printed product meets the approved proof standard

3. Maintain routine production process

3.1 Production process is operated in association with fellow workers and according to company specifications and planned daily schedule

3.2 Production is maintained within work health and safety (WHS) requirements, and company and manufacturer’s specifications

3.3 Manual and/or automatic control is used as per specification

3.4 Performance is monitored and verified using the process control system according to enterprise procedures

3.5 Ink performance, colour, register and position of print are monitored and adjusted throughout production run

3.6 Production difficulties are anticipated and preventive action is taken to avoid disruption

3.7 Process adjustments to eliminate problems are reported according to enterprise procedures

3.8 Waste is sorted according to enterprise procedures

4. Identify and rectify faults

4.1 Problems in pad printing machine operation are identified and reported according to enterprise procedures

4.2 Adjustments or corrections are carried out according to specified procedures and consistent with operator’s skill level

4.3 Pad printing machine operation is checked to ensure correct operation

4.4 Faulty performance of equipment is identified and reported according to enterprise procedures

5. Conduct shutdown

5.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures

5.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements

5.3 Unused ink is correctly labelled and stored according to manufacturer/supplier specifications and enterprise procedures

5.4 Solid and liquid waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures

5.5 Product is removed from operating area

5.6 Machine faults requiring repair are identified and reported to designated person according to enterprise procedures

5.7 Repair/adjustment is verified prior to resumption of operations

6. Clean and wash printing machine at end of print run

6.1 Plates and pads are cleaned ready for next run

6.2 Inking system is washed up ready for next run, and liquid waste is disposed of according to company and regulatory requirements

6.3 Pre- and post-treatment units are cleaned ready for next run

6.4 Production records or other documentation are accurately completed, where required by enterprise procedures

Evidence of the ability to:

safely produce TWO basic pad printing jobs (if possible on different substrates) to meet job specifications, enterprise procedures and work health and safety (WHS) requirements

correctly shut down and clean pad printing machine and, if possible, rectify any production problems with minimum downtime.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline major WHS concerns of operating this machine

identify where the Material Safety Data Sheets (MSDS) are stored and what information they contain

explain different machine cycle modes and how colour density of a light image on a dark substrate can be improved

outline process for selecting the appropriate machine cycle mode to provide the highest production output for a particular product

explain correct ink viscosity during production

explain causes of unreleased ink remaining on the printing pad and how this issue is identified

explain the correct process for recognising a damaged pad and the correct method of cleaning a pad during production

outline pre- and post-treatment requirements and the simple pre-treatment commonly required for injection-moulded objects

identify how long ink on the job takes to cure before scratch and adhesion tests can be performed

describe common print problems, how they are identified, and how they can be rectified

describe visible effects in the image if ink viscosity is incorrect

outline the process for adjusting the machine to correct a shift in image position on the product

identify machine manuals, safety and other documentation relevant to this task, where they are kept and information they contain.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the printing field of work and include access to:

pad printing machine

special purpose tools, equipment and materials.

Assessors must satisfy NVR/AQTF assessor requirements.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Maintain routine pad printing process

1.1 Location of objects into fixtures is monitored and adjusted if necessary

1.2 Printing plate condition is monitored to ensure quality of printed product meets the approved proof standard

1.3 Printing pad condition is monitored and maintained to ensure quality of printed product meets the approved proof standard

1.4 Spatula and doctor blade are monitored and adjusted to ensure quality of printed product meets the approved proof standard

OR

1.5 Ink cup is monitored and adjusted to ensure quality of printed product meets the approved proof standard

1.6 Printing ink viscosity is monitored and adjusted to ensure quality of printed product meets the approved proof standard

2. Maintain manual pre- and post-treatments

2.1 Manual loading is monitored and adjusted to ensure quality of printed product meets the approved proof standard

2.2 Manual pre-treatment is monitored and adjusted to ensure quality of printed product meets the approved proof standard

2.3 Drying racks are monitored and adjusted to ensure quality of printed product meets the approved proof standard

3. Maintain routine production process

3.1 Production process is operated in association with fellow workers and according to company specifications and planned daily schedule

3.2 Production is maintained within work health and safety (WHS) requirements, and company and manufacturer’s specifications

3.3 Manual and/or automatic control is used as per specification

3.4 Performance is monitored and verified using the process control system according to enterprise procedures

3.5 Ink performance, colour, register and position of print are monitored and adjusted throughout production run

3.6 Production difficulties are anticipated and preventive action is taken to avoid disruption

3.7 Process adjustments to eliminate problems are reported according to enterprise procedures

3.8 Waste is sorted according to enterprise procedures

4. Identify and rectify faults

4.1 Problems in pad printing machine operation are identified and reported according to enterprise procedures

4.2 Adjustments or corrections are carried out according to specified procedures and consistent with operator’s skill level

4.3 Pad printing machine operation is checked to ensure correct operation

4.4 Faulty performance of equipment is identified and reported according to enterprise procedures

5. Conduct shutdown

5.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures

5.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements

5.3 Unused ink is correctly labelled and stored according to manufacturer/supplier specifications and enterprise procedures

5.4 Solid and liquid waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures

5.5 Product is removed from operating area

5.6 Machine faults requiring repair are identified and reported to designated person according to enterprise procedures

5.7 Repair/adjustment is verified prior to resumption of operations

6. Clean and wash printing machine at end of print run

6.1 Plates and pads are cleaned ready for next run

6.2 Inking system is washed up ready for next run, and liquid waste is disposed of according to company and regulatory requirements

6.3 Pre- and post-treatment units are cleaned ready for next run

6.4 Production records or other documentation are accurately completed, where required by enterprise procedures

Evidence of the ability to:

safely produce TWO basic pad printing jobs (if possible on different substrates) to meet job specifications, enterprise procedures and work health and safety (WHS) requirements

correctly shut down and clean pad printing machine and, if possible, rectify any production problems with minimum downtime.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline major WHS concerns of operating this machine

identify where the Material Safety Data Sheets (MSDS) are stored and what information they contain

explain different machine cycle modes and how colour density of a light image on a dark substrate can be improved

outline process for selecting the appropriate machine cycle mode to provide the highest production output for a particular product

explain correct ink viscosity during production

explain causes of unreleased ink remaining on the printing pad and how this issue is identified

explain the correct process for recognising a damaged pad and the correct method of cleaning a pad during production

outline pre- and post-treatment requirements and the simple pre-treatment commonly required for injection-moulded objects

identify how long ink on the job takes to cure before scratch and adhesion tests can be performed

describe common print problems, how they are identified, and how they can be rectified

describe visible effects in the image if ink viscosity is incorrect

outline the process for adjusting the machine to correct a shift in image position on the product

identify machine manuals, safety and other documentation relevant to this task, where they are kept and information they contain.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the printing field of work and include access to:

pad printing machine

special purpose tools, equipment and materials.

Assessors must satisfy NVR/AQTF assessor requirements.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Location of objects into fixtures is monitored and adjusted if necessary 
Printing plate condition is monitored to ensure quality of printed product meets the approved proof standard 
Printing pad condition is monitored and maintained to ensure quality of printed product meets the approved proof standard 
Spatula and doctor blade are monitored and adjusted to ensure quality of printed product meets the approved proof standard 
Ink cup is monitored and adjusted to ensure quality of printed product meets the approved proof standard 
Printing ink viscosity is monitored and adjusted to ensure quality of printed product meets the approved proof standard 
Manual loading is monitored and adjusted to ensure quality of printed product meets the approved proof standard 
Manual pre-treatment is monitored and adjusted to ensure quality of printed product meets the approved proof standard 
Drying racks are monitored and adjusted to ensure quality of printed product meets the approved proof standard 
Production process is operated in association with fellow workers and according to company specifications and planned daily schedule 
Production is maintained within work health and safety (WHS) requirements, and company and manufacturer’s specifications 
Manual and/or automatic control is used as per specification 
Performance is monitored and verified using the process control system according to enterprise procedures 
Ink performance, colour, register and position of print are monitored and adjusted throughout production run 
Production difficulties are anticipated and preventive action is taken to avoid disruption 
Process adjustments to eliminate problems are reported according to enterprise procedures 
Waste is sorted according to enterprise procedures 
Problems in pad printing machine operation are identified and reported according to enterprise procedures 
Adjustments or corrections are carried out according to specified procedures and consistent with operator’s skill level 
Pad printing machine operation is checked to ensure correct operation 
Faulty performance of equipment is identified and reported according to enterprise procedures 
Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures 
Shutdown is conducted in association with fellow workers and in compliance with WHS requirements 
Unused ink is correctly labelled and stored according to manufacturer/supplier specifications and enterprise procedures 
Solid and liquid waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures 
Product is removed from operating area 
Machine faults requiring repair are identified and reported to designated person according to enterprise procedures 
Repair/adjustment is verified prior to resumption of operations 
Plates and pads are cleaned ready for next run 
Inking system is washed up ready for next run, and liquid waste is disposed of according to company and regulatory requirements 
Pre- and post-treatment units are cleaned ready for next run 
Production records or other documentation are accurately completed, where required by enterprise procedures 

Forms

Assessment Cover Sheet

ICPPRN242 - Produce basic pad printed product
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPPRN242 - Produce basic pad printed product

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: