This unit applies to team leaders and people with a similar sphere of influence and scope of authority and responsibility and covers the skills required to respond to a situation where people, processes, equipment or systems fail to meet requirements (there is a major non-conformance) for whatever reason, and this will have significant business consequences. The non-conformance may be anywhere in the value chain, not necessarily in the team, department or area which needs to respond. Many teams, departments or areas may need to respond. However, this unit applies to the skills needed to lead a single team, department or area response.

This unit is not primarily about identification of the cause of the non-conformance but rather about skills for appropriate responses to contain the situation, including not allowing it to accelerate or cascade. It is also about skills to minimise the adverse consequences while doing what can be done at the team, department or area level to remedy the situation.

This unit does not cover the specialist skills required to contain/remediate an emergency non-conformance such as a fire or explosion. Relevant emergency management skills from other Training Packages should be accessed for these skills.

This unit may be also applied to service organisations applying competitive manufacturing principles.

This unit covers the skills and knowledge required to lead a response at a team or area level to a major non-conformance which could have severe business impacts.

The unit can be applied to sub-sections of an enterprise such as a team, area or department, or in the case of a small or medium sized manufacturer, to the whole enterprise.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Demonstrates skills and knowledge required to:

recognise and deal effectively with a major non-conformance.

In particular look for evidence of:

defining the impact of the non-conformance

developing and prioritising appropriate responses to contain the impacts of the non-conformance

implementation, monitoring and modifying responses.

Context of and specific resources for assessment

Assessment may occur on the job or in an appropriately simulated environment. Access is required to real or appropriately simulated situations, including work areas, materials and equipment, and to information on workplace practices and OHS practices.

Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.

Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.

Method of assessment

Assessment must satisfy the endorsed assessment guidelines of the Manufacturing Training Package.

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge.

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application.

Assessment may be applied under project related conditions (real or simulated) and require evidence of process.

Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.

Assessment may be in conjunction with assessment of other units of competency where required.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

decision making

communication at all levels

prioritisation

negotiation

problem solving including root cause analysis

situation analysis

speed

Required knowledge

the importance of standardisation in production processes

customer needs as distinct from wants

communication methods

sources of additional resources

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Codes of practice/standards

Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used

Major non-conformance

A major non-conformance may be:

a failure to receive a delivery

receiving a delivery which is out of specification

a failure of the transport system to make deliveries to customers or from suppliers

a problem in the process which fails to produce product or only produces non-conforming product

a major incident such as a fire or loss of containment

a breakdown of critical plant/equipment

a commercial or legal problem which affects the ability to produce to requirements

excessive absences of key personnel due illness, or transport breakdown

a security situation preventing key personnel from performing their duties and/or deliveries being made

a major supply shortage or price increase

Business impacts

Business impacts may include:

sudden increase in defect rates

loss of supply of materials or components

loss or severe restriction of process capability

loss of transport from process

increases in fuel energy costs

increases in the cost of finance/capital.

Performance

Performance includes:

the production volume, quality, cost, HSE and similar measures as appropriate at the team level

Response

Response includes all those strategies which will minimise the impact of the non-conformance on the customer and must be consistent with:

the philosophies and strategies of the organisation

HSE requirements

delivery, statutory and contractual requirements

Response may include:

supply from another source

production from other areas

agreements for reduced supply

agreements to accept different quality

Response duration may include:

short term response to cover immediate situation

different long and medium term response

transition strategies where there are different strategies at different phases of the response

Timing of responses

Timing of response may be controlled by the nature of the non-conformance and may include:

implementation following initial containment/ stabilisation of situation (e.g. where the non-conformance is a major incident such as a fire or loss of containment)

immediate initiation but delayed implementation (e.g. where the non-conformance is a breakdown of critical plant/equipment which will require repair/replacement before implementation)

immediate implementation (e.g. when the non-conformance does not prevent the response from starting or there is an alternative which bypasses the non-conformance)

Health, safety and environment (HSE)

All changes implemented are expected to be at least neutral, or preferably beneficial, in their impact on health, safety and environment

Stakeholders

Stakeholders include:

work team members, value chain members as well as other stakeholders and may be internal and external to the team and possibly the organisation

Team leader

Team leader may include:

any person who may have either a permanent or an ad hoc role in facilitating the function of a team in a workplace

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify target performance prior to non-conformance 
Determine commencement and expected duration of non-conformance 
Determine impact of non-conformance on target performance 
Determine impact of non-conformance with health, safety and environment (HSE) performance 
Determine impact of non-conformance on maintenance performance 
Liaise with customers to determine minimum acceptable performance during period of non-conformance 
Define non-conformance in terms of customer requirements and target performance 
Develop possible responses appropriate to the situation 
Determine possible timing of possible responses 
Identify required resources for the responses developed 
Evaluate possible responses and select or shortlist responses 
Select responses and obtain necessary approvals 
Organise resources as appropriate 
Determine the information needs of stakeholders 
Identify the sources of required information 
Arrange to collect required information 
Obtain authorisation to disseminate information 
Report information to stakeholders as appropriate 
Initiate response and establish data and information collection procedures 
Analyse data and other information as it comes to hand 
Determine progress of response to achieving required outcomes 
Modify response including deployment of resources as required to better achieve desired outcomes 
mine root cause of non-conformance 
Develop remedial plan to eliminate root cause 
Obtain sign off from process/system owner for planned action 
Implement remedial plan and establish normal conformance 
Conduct a debrief and complete reports as required 
Evaluate and review response and procedures 
Evaluate and document effectiveness of the response function and its interaction/communication with stakeholders 
Recommend improvements to prevent a recurrence and improve response for other non-conformances 
Communicate reports in accordance with company procedures 

Forms

Assessment Cover Sheet

MSACMG707A - Respond to a major non-conformance
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSACMG707A - Respond to a major non-conformance

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: