Elements and Performance Criteria
- Develop and implement construction procedures
- Develop employment and contract management procedures
- Develop procedures for controlling and recording site deliveries
- Develop procedures for recording the hire of plant and equipment
- Determine work health and safety procedures, including risk assessment
- Notify client, authorities and agencies of the schedule of works
- Develop procedures for dealing with environmental issues associated with construction work
- Organise resource requirements
- Nominate tasks and timelines, including the required resources for each
- Organise labour requirements
- Verify the correct parts and equipment have been delivered to the site and checked
- Select and maintain equipment and machinery
- Allocate jobs and tasks to the work team
- Carry out safety induction for the task and site
- Interpret the irrigation drainage system design for the site
- Supervise preparatory work
- Supervise construction of the drainage system
- Interpret plan and supervise construction work
- Confirm trenches are excavated to specification
- Confirm earth works are carried out appropriately
- Confirm construction of drainage structures are to specifications
- Inspect the lay out and joining of pipes
- Check the fitting and adjustment of fittings and valves and confirm all joints are secured
- Supervise the installation and testing of the pumping system
- Commission the irrigation drainage system
- Supervise the rehabilitation of the works area