Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for building approval processes.
  2. Monitor adherence of building application to administrative requirements.
  3. Collate and analyse building approval application documentation.
  4. Manage areas of non-compliance
  5. Manage stakeholder communications.
  6. Manage finalisation of the building approval application.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Compliance requirements must include:

current Australian standards applicable to the building design

federal, state or territory and local authority legislation and regulations applicable to the building design

National Construction Code (NCC).

Building application documentation must include:

building approval application form

concept and architectural plans and drawings to scale, with relevant calculations, levels, notes and specifications

proof of builder’s registration

proof of building site ownership.

Planning conditions must include:

approved concept plans

expiry date of permit

use of property.

Type of building must include:

Type A buildings as defined in the BCA, including buildings that are:

3 storeys or more in classes 2, 3 and 9

4 storeys or more in classes 5, 6, 7 and 8

Type B buildings as defined in the BCA

Type C buildings as defined in the BCA.

Consultants must include at least one of the following:

access consultants

energy efficiency assessors

fire services engineers

geotechnical engineers

heritage consultants

hydraulic engineers

mechanical engineers

structural engineers

waterproofing specialists.

Service authorities must include:

drainage authority

electricity supply authority

gas supply authority

relevant municipal council

sewerage authority

water supply authority.

Building permit conditions must include:

time validity of building permit

whether the permit applies to whole or a stage of the proposed building work.