Elements and Performance Criteria
- Prepare sets for production
- Liaise with relevant production personnel to confirm production requirements
- Review documentation relevant to production and analyse to ensure set requirements are fully met
- Document condition of sets from all sources to ensure they meet required quality standards for production
- Identify and repair faults or arrange with relevant production personnel to carry out specific alterations where applicable
- Ensure sets are labelled, coded and stored to facilitate production requirements
- Ensure relevant production personnel are briefed thoroughly on use, functions and placement of sets, including requirements for complying with OHS regulations
- Pack sets for transport
- Assist relevant production personnel to coordinate plans for transport to, and assembly of sets at, production sites
- Confirm availability of adequate facilities to meet set requirements at production sites
- Conduct checks on all equipment and sets prior to departure and complete documentation according to enterprise procedures
- Pack sets in appropriate containers for transport to production sites and load using safe lifting and handling methods
- Complete stock orders as required and ensure delivery to production sites in line with production requirements
- Assemble and strike sets during productions
- Check availability of set requirements and equipment and confirm with relevant production personnel any variations to original production requirements
- Brief relevant production personnel about safety features and requirements associated with sets as applicable
- Assemble sets ensuring all work is completed safely, securely and on time
- Reassemble or strike sets according to production requirements ensuring continuity and appearance of sets are maintained
- Assess whether damaged sets can continue to be used in production and arrange for replacements where necessary after referral to relevant production personnel
- Ensure sets no longer required during production are stored securely and safely or returned to original sources in good condition
- Strike sets
- Strike sets at conclusion of productions and safely pack and load for transportation
- Arrange return of items and equipment to original sources as applicable
- Report equipment that is damaged and requires maintenance to relevant production personnel and document requirement
- Finalise required documentation according to enterprise procedures and protocols
- Leave production site in original or improved condition, ensuring no adverse impact on the site