Elements and Performance Criteria
- Identify preparation requirements
- Applicable OHS, legislative and organisational requirements relevant to receiving, preparing, packaging, protecting, transporting, loading and storage of floor coverings are verified and complied with
- Floor Covering materials to be prepared are identified against work orders
- Instructions, work plans and product information are read and interpreted to identify the preparation process required to complete work tasks
- Details of the site conditions, including safety and security requirements, are confirmed from reports or physical inspection
- Delivery point, access and storage on site are identified and methods for loading/hoisting floor coverings are determined
- Size, shape and special packaging requirements are determined for transportation to site
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Receive flooring materials
- Flooring materials are received and segregated into products
- Received materials are checked against delivery documentation for type and quantity
- Received materials are inspected for defects and damage and unacceptable items rejected or segregated
- Receipt documentation is completed to enterprise procedures
- Prepare and package floor coverings
- Load floor coverings on to the worksite
- Roles and related responsibilities for the successful completion of the loading and lifting activity are identified and applied
- Time requirements to complete the loading/lifting of floor coverings are estimated
- Materials handling equipment appropriate to the task is selected, accessed and used in accordance with regulatory and/or site requirements
- Labour requirements to support the floor covering loading/lifting requirements are confirmed and accessed
- Movement activities are completed as an individual or working directly with others as required by the work tasks
- Store floor coverings and accessories on site
- Condition of floor coverings, and accessory products is observed on arrival on site and any damaged product is identified and separated for further action
- Floor coverings and accessory products are stored on site observing any requirements for protection from potential damage factors
- Product and site acclimatisation requirements are identified and satisfied
- Materials are stacked appropriately for weight loading, size and crush-ability of floor coverings or accessory products
- Products are located to enable ready access when required on site
- Work is undertaken in accordance with workplace procedures
- Complete housekeeping