Elements and Performance Criteria
- Prepare for installation
- Applicable legislative, OHS and organisational requirements relevant to installing resilient wall coverings are verified and complied with
- Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- Sub-strate condition is assessed for suitability for installation of resilient coverings to the walls
- Suitable adhesives, trims and accessories are selected
- Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
- Set-out floor coverings
- Resilient wall covering to be installed is checked against order
- Resilient wall coverings are acclimatised according to manufacturer recommendations
- Resilient wall coverings for fixing are organised and used in accordance with relevant safety management requirements
- Working lines and starting point are established
- Pre-form fillet is cut and fitted (if required)
- Feathering systems and applications are prepared and applied in accordance with the installation plan
- Install resilient sheet
- Resilient wall coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
- The aesthetics of the materials is maximised where appropriate, matching grains, colours and patterns
- Materials are cut to length and size, allowing for final adjustment, trimming and welding processes
- Header and/or perimeter contact adhesive is applied to surfaces
- Adhesive is applied to the body of the walls as specified by the adhesive manufacturer
- Resilient wall covering is positioned in accordance with the plan, pressed out and hand-rolled
- Resilient wall covering is heated to form required profiles
- Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards
- Joins and/or seams are trimmed and finished to industry standards
- Resilient wall coverings are sealed to floor coverings, door and window frames, as well as fixtures and fittings in wet area installations
- Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures
- Complete housekeeping