Elements and Performance Criteria
- Plan and prepare
- Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant
- Obtain, interpret, clarify and confirm work instructions before proceeding
- Confirm and apply environmental protection and safety requirements
- Obtain, interpret and implement traffic management signage requirements
- Select and check for faults plant, tools and equipment to carry out tasks
- Identify, address and report hazards, risks and environmental issues
- Prepare for formwork erection
- Identify and confirm location and design of formwork/false work
- Accurately place key set out locations
- Prepare work area and materials for the erection of formwork/false work
- Assemble formwork shutters
- Sequentially erect formwork support system (false work)
- Check scaffolding and/or hand railing where required
- Place bracing of formwork support to maintain rigidity and stability
- Set support system to correct height level, line and tolerance
- Erect formwork
- Fabricate, position and fix formwork for beams, drop panels and cantilevers into place
- Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance
- Fabricate, position and fix soffit formwork into place
- Fix edge boxing to formwork in correct position and plumb to alignment.
- Brace formwork
- Install cast-ins, inserts and penetration blocks to locations
- Inspect formwork
- Stripping of formwork
- Obtain approval to remove formwork/false work support
- Carefully remove edge boxing and braces, denail, clean and store/stack
- Back off support system to appropriate height to loosen soffit decking
- Safely and sequentially remove formwork, denail and relocate or store
- Select and install appropriate back propping system, where applicable
- Clean up
- Plan and prepare
- Access, interpret and apply construct formwork and false work on concrete bridges documentation and ensure the work activity is compliant
- Obtain, interpret, clarify and confirm work instructions before proceeding
- Confirm and apply environmental protection and safety requirements
- Obtain, interpret and implement traffic management signage requirements
- Select and check for faults plant, tools and equipment to carry out tasks
- Identify, address and report hazards, risks and environmental issues
- Prepare for formwork erection
- Identify and confirm location and design of formwork/false work
- Accurately place key set out locations
- Prepare work area and materials for the erection of formwork/false work
- Assemble formwork shutters
- Sequentially erect formwork support system (false work)
- Check scaffolding and/or hand railing where required
- Place bracing of formwork support to maintain rigidity and stability
- Set support system to correct height level, line and tolerance
- Erect formwork
- Fabricate, position and fix formwork for beams, drop panels and cantilevers into place
- Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance
- Fabricate, position and fix soffit formwork into place
- Fix edge boxing to formwork in correct position and plumb to alignment.
- Brace formwork
- Install cast-ins, inserts and penetration blocks to locations
- Inspect formwork
- Stripping of formwork
- Obtain approval to remove formwork/false work support
- Carefully remove edge boxing and braces, denail, clean and store/stack
- Back off support system to appropriate height to loosen soffit decking
- Safely and sequentially remove formwork, denail and relocate or store
- Select and install appropriate back propping system, where applicable
- Clear work area and dispose of or recycle materials
- Clean, check, maintain and store plant, tools and equipment