Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for basic rigging
  2. Prepare rigging equipment
  3. Move loads
  4. Clean up

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements requirements, procedures and techniques for the safe, effective and efficient completion of performing basic rigging including:

conducting risk assessment and implementing controls

erecting and dismantling, levelling, plumbing and stabilising associated plant and structures

works effectively with others to undertake and complete the performance of basic rigging that meets all of the required outcomes including:

checks and verifies work activity with client, load designer and others

communicating hazards and determining elimination or control of hazards

using a range of communication techniques and systems to convey instruction or information to others

provides end of work handover to relevant personnel

demonstrates completion of performing basic rigging that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

writing a preliminary rigging plan which must include the following points in detail:

confirmed details of rigging requirement

confirmed dimensions

site access and egress

suitability and availability of materials

tools and equipment

identification of potential hazards

control measures

identification of site coordination requirements

unless otherwise specified, rigging is to conform with the requirements of any relevant National Certification and/or Standards

selecting and conducting pre and post operational inspection of equipment including:

plant

safety harnesses

fall arrest systems

communication equipment

installing and maintaining the following:

static lines and safety nets

perimeter safety screens and shutters

erection of the following:

material hoists

mast climbing personnel platforms

performing mathematical calculations for estimation and measurement of loads

using rope to attach tag lines using knots, bend and hitches including:

sheet bend

becket hitch

running bowline knot

double bowline knot

using ropes for splices and whipping techniques including:

back splice

eye splice

short splice

common whipping

sailmakers whipping

west country whipping

movement and relocation of plant and equipment including:

slinging

loading

directing

moving

unloading