Elements and Performance Criteria
- Plan assembly/dismantling
- Job hazards are identified and required action is taken to minimise, control or eliminate identified hazards
- Level as is possible and unobstructed site is selected to assemble/dismantle boom and/or jib
- Plan for crane assembly and dismantling is developed in accordance with appropriate Australian Standard, other statutory regulations, licensing requirements and manufacturer specifications
- Assemble/dismantle boom or jib
- Equipment, including personal protective equipment, is assembled and used as appropriate for task requirements
- Plan for assembly or dismantling of boom/jib is carried out in accordance with manufacturer specifications, appropriate Australian Standards and other relevant statutory regulations and guides
- All connections on boom and jib pendants and rope anchorages are checked before boom is raised, to ensure they are in good order, tight and secure
- Documentation is completed in accordance with workplace procedures