Elements and Performance Criteria
- Plan work
- Site inspection is completed and potential workplace hazards are identified prior to commencement of operations
- Hazard control measures are identified and implemented consistent with appropriate standards to ensure the safety of personnel and equipment
- Job requirements are confirmed with appropriate personnel
- Work is planned to comply with instructions, risk assessment, and operating and emergency procedures
- Weight of container is identified or confirmed in consultation with appropriate personnel
- Appropriateness of reach stacker to the container/s and workplace conditions is ensured
- Appropriate path for moving containers in work area is determined and inspected
- Appropriate communications methods are identified and selected in accordance with procedures
- Conduct routine checks
- Reach stacker is accessed in a safe manner in accordance with procedures
- Reach stacker service logbook is checked for compliance
- Routine pre-start operational checks are carried out in accordance with procedures and are completed in a safe manner
- Reach stacker is visually checked for any damage or defects
- Visibility and legibility of all signage and labels is ensured in accordance with the appropriate standard
- All reach stacker controls are located and identified
- Post-start operational checks are carried out in accordance with procedures including operational functions to limits
- Reach stacker is started in accordance with procedures and is checked for any abnormal instrument readings/warnings, lights and noises
- All reach stacker safety devices and communications equipment are checked for serviceability in accordance with procedures
- All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken
- Prepare reach stacker operations
- Ground suitability is checked to ensure stability and safe operation of reach stacker
- Reach stacker is driven to work area and prepared for container operations in accordance with procedures and manufacturer specifications
- Appropriate reach stacker stability requirements for task are determined in accordance with procedures and range diagram/load chart
- Container data is input into reach stacker computer as required in accordance with workplace procedures
- Appropriate hazard prevention/control measures are implemented and communicated with personnel in work area in accordance with procedures
- Operate reach stacker
- Container weights are checked to ensure they are within reach stacker capacity in accordance with range diagram/load chart
- Hazard prevention/control measures are complied with during reach stacker operations
- Container spreader is positioned over container following directions from associated personnel
- Test lift is carried out in accordance with procedures to allow for checks to be safely made, in consultation with relevant personnel
- All required communications signals are correctly interpreted in accordance with procedures and the appropriate standard
- Reach stacker is operated in accordance with procedures and the appropriate standard
- Containers are stacked/unstacked using all relevant reach stacker and spreader movements in accordance with procedures and the appropriate standard
- Container movement is monitored constantly, to ensure safety of personnel and container, and reach stacker stability
- Container is stacked in accordance with procedures, ensuring ground conditions are suitable for stacking containers and stability of the stack, safety of personnel and container
- Unplanned and/or unsafe situations are responded to in accordance with procedures
- Travel reach stacker and mobile container
- Suitability of planned route for reach stacker is checked in accordance with procedures
- Reach stacker is configured to mobile containers in accordance with procedures and the appropriate standard, WHS/OHS legislation and codes of practice
- Containers are mobilised to ensure safety of personnel and container, and stability of reach stacker
- Container is mobilised using best mobile practice in accordance with procedures
- Shut down and secure reach stacker
- Reach stacker boom and container spreader are packed up and secured as required, in accordance with procedures and the appropriate standard
- Relevant locking devices and brakes are applied as required
- Stabilisers are stowed and secured in accordance with procedures as required
- Reach stacker is parked and shut down in accordance with procedures
- Routine post-operational checks are carried out in accordance with procedures
- All damage and defects are recorded and reported in accordance with procedures, and appropriate action is taken