UEGNSG207
Coordinate construction, laying and testing of gas distribution pipelines


Application

This unit involves the skills and knowledge required to coordinate construction, laying and testing of gas distribution pipelines and associated equipment.

It includes notifying other services, communicating with appropriate person/s, ensuring the correct materials, tools and equipment are used and completing relevant documentation.

No licensing, legislative or certification requirements apply to this unit at the time of publication.


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to coordinate pipeline installation

1.1

Location of services are verified and alignment of gas main and associated equipment are confirmed, as necessary, by site inspection in accordance with work schedule and workplace procedures

1.2

Job requirements and workplace procedures for the work are obtained for all work sites and communicated to relevant person/s in accordance with workplace procedures

1.3

Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy policies and procedures related to the work are obtained, applied and communicated with relevant person/s in accordance with workplace procedures

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures

1.5

Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

1.6

Relevant work permits are obtained to access, isolate/de-isolate systems and perform the work in accordance with regulatory requirements and workplace procedures

1.7

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained checked for correct operation and safety in accordance with workplace procedures

1.8

Communication with authorised person/s, authorities, clients and land-owners is conducted and work coordinated in accordance with work schedule and workplace procedures

1.9

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

1.10

Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures

1.11

Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan

2

Coordinate construction, laying and testing of pipelines

2.1

WHS/OHS and environment risk control measures, schedule of work and workplace procedures for carrying out work are followed

2.2

Hazardous activities are conducted safely and currency confirmed in accordance with regulatory requirements and workplace procedures

2.3

Construction, laying and testing of gas distribution pipelines is coordinated to ensure completion in agreed timeframe and to required standards with a minimum of waste in accordance with job requirements and workplace procedures

2.4

Construction, laying and testing work is coordinated in accordance with the work schedule and workplace procedures

2.5

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

2.6

Unplanned events encountered when coordinating the construction, laying and testing work are identified and actioned in accordance with workplace procedures

3

Complete the coordination of pipeline construction and laying and relevant documentation

3.1

Final inspections of work are undertaken, checked against work schedule for conformance and anomalies reported in accordance with workplace procedures

3.2

Accidents and injuries are reported, as required, in accordance with workplace procedures

3.3

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

3.4

Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

3.5

Relevant work permit/s are signed off and pipeline returned to service in accordance with job requirements and workplace procedures

3.6

Work completion records, reports and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.


Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

tools and equipment must include at least three (3) of the following:

excavation

trenching

shoring

stitch bore

horizontal drilling

directional drilling

pipe connections must include at least four (4) of the following: :

nylon (polymide) pipeline laying techniques

nylon gluing

connection of nylon to other materials

nylon stop off

unplasticised polyvinyl chloride (uPVC) pipeline laying techniques

uPVC solvent cemented joints

uPVC moulded joints

uPVC stop off

uPVC couplings or flanges

connection of uPVC to other material

procedures must include at least five (5) of the following:

polyethylene (PE) pipeline laying techniques

large diameter PE

PE electro fusion

PE butt fusion

saddle fusion

socket fusion

PE stop off

compression couplings or flanges

connection of PE to other materials

practical application of installation and maintenance of plastic pipe systems

procedures must include at least two (2) of the following:

steel pipeline coating repair

steel pipeline coating testing (jeeper)

steel, field joint coating

procedures must include at least three (3) of the following:

connection of PE to steel mains

steel mains welding

steel mains repair

sleeve application

clamp application

hot tap and stopple

isolation methods must include at least two (2) of the following:

high pressure stop off

bagtube

squash off jacks

squash off pliers


Sectors

Gas Industry


Competency Field

Gas Distribution