Coordinate construction, laying and testing of gas distribution pipelines

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEGNSG207, 'Coordinate construction, laying and testing of gas distribution pipelines'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Coordinate construction, laying and testing of gas distribution pipelines' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to coordinate pipeline installation

1.1

Location of services are verified and alignment of gas main and associated equipment are confirmed, as necessary, by site inspection in accordance with work schedule and workplace procedures

1.2

Job requirements and workplace procedures for the work are obtained for all work sites and communicated to relevant person/s in accordance with workplace procedures

1.3

Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy policies and procedures related to the work are obtained, applied and communicated with relevant person/s in accordance with workplace procedures

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures

1.5

Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

1.6

Relevant work permits are obtained to access, isolate/de-isolate systems and perform the work in accordance with regulatory requirements and workplace procedures

1.7

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained checked for correct operation and safety in accordance with workplace procedures

1.8

Communication with authorised person/s, authorities, clients and land-owners is conducted and work coordinated in accordance with work schedule and workplace procedures

1.9

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

1.10

Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures

1.11

Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan

2

Coordinate construction, laying and testing of pipelines

2.1

WHS/OHS and environment risk control measures, schedule of work and workplace procedures for carrying out work are followed

2.2

Hazardous activities are conducted safely and currency confirmed in accordance with regulatory requirements and workplace procedures

2.3

Construction, laying and testing of gas distribution pipelines is coordinated to ensure completion in agreed timeframe and to required standards with a minimum of waste in accordance with job requirements and workplace procedures

2.4

Construction, laying and testing work is coordinated in accordance with the work schedule and workplace procedures

2.5

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

2.6

Unplanned events encountered when coordinating the construction, laying and testing work are identified and actioned in accordance with workplace procedures

3

Complete the coordination of pipeline construction and laying and relevant documentation

3.1

Final inspections of work are undertaken, checked against work schedule for conformance and anomalies reported in accordance with workplace procedures

3.2

Accidents and injuries are reported, as required, in accordance with workplace procedures

3.3

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

3.4

Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

3.5

Relevant work permit/s are signed off and pipeline returned to service in accordance with job requirements and workplace procedures

3.6

Work completion records, reports and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures


Qualifications and Skillsets

UEGNSG207 appears in the following qualifications:

  • UEG30110 - Certificate III in Gas Industry Operations
  • UEG60211 - Advanced Diploma of Gas Supply Industry Operations
  • UEG40311 - Certificate IV in Gas Supply Industry Operations
  • UEG50211 - Diploma of Gas Supply Industry Operations
  • UEG50114 - Diploma of Gas Supply Industry Operations
  • UEG60114 - Advanced Diploma of Gas Supply Industry Operations