Implement a program to operate, maintain or upgrade a recirculating aquaculture system

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver SFIAQU410, 'Implement a program to operate, maintain or upgrade a recirculating aquaculture system'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Implement a program to operate, maintain or upgrade a recirculating aquaculture system' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan operation and maintenance of a recirculating aquaculture system

1.1 Confirm operations, maintenance or design or upgrade specifications in the culture or holding system or facility with senior personnel

1.2 Draw up work plans or schedules, order materials and arrange labour and appropriate equipment according to specifications and in consultation with senior personnel

1.3 Check raw and prefabricated materials against delivery manifest or specifications

1.4 Prepare worksite according to specifications, and secure for safety or loss prevention

1.5 Assess potential risks, including environmental and water quality parameters for the cultured or held stock, and prepare contingency plans

1.6 Brief staff members on work objectives relevant to the site, equipment being used and type of maintenance or upgrade activities

1.7 Quantify costs and confirm budget with senior personnel

2. Implement operations, maintenance or upgrade program

2.1 Implement work plan to minimise disruption to workplace operations and stress to cultured or held stock

2.2 Monitor progress of maintenance or upgrade program against the work plan, and adjust for unforeseen circumstances

2.3 Confirm availability of required materials, resource and supply provisions, and labour

2.4 Anticipate, avoid or minimise hazards and environmental implications and other potential problems through contingency planning

3. Monitor operations, maintenance or upgrade activities

3.1 Monitor operations, maintenance or upgrade activities and component or system performances against maintenance or upgrade plan

3.2 Monitor costs within workplace budget requirements

3.3 Give feedback to staff members on work progress and performance

3.4 Prepare records or reports to management on project progress

3.5 Check and ensure that the maintained or upgraded system or facility fits maintenance or design specifications, is operable and complies with biosecurity regulatory requirements

3.6 Check budget for operations, maintenance or upgrade, and report major discrepancies to senior personnel

4. Finalise and review operations, maintenance and upgrade activities

4.1 Supervise clean-up of work area, including repairs and storage of equipment

4.2 Record relevant operations, maintenance and upgrade data, observations or information, and check any abnormal records

4.3 Prepare required reports for senior personnel