Commission large fire protection systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEENEEH164A, 'Commission large fire protection systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Commission large fire protection systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1

Prepare to commission

1.1

OHS procedures for a given work area are identified, obtained and understood.

1.2

Established OHS risk control measures and procedures are followed in preparation for the work.

1.3

Safety hazards, which have not previously been identified, are documented and risk control measures devised and implemented in consultation with appropriate personnel.

1.4

The extent of commissioning is determined from reports and other documentation and from discussion with appropriate personnel.

1.5

Appropriate personnel are consulted to ensure the work is co-ordinated effectively with others involved on the work site.

1.6

Tools, equipment and testing devices needed to program and commission are obtained in accordance with established procedures and checked for correct operation and safety.

2

Commission fire protection systems

2.1

OHS risk control measures and procedures for carrying out the work are followed.

2.2

The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures.

2.3

Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures.

2.4

Fire protection system components are verified as complying with design specifications and regulations.

2.5

Fire protection devices are checked for correct location and alignment.

2.6

Fire protection functions are tested in accordance with commissioning requirements.

2.7

Sources of fire protection system anomalies are identified and corrected.

2.8

Decisions for dealing with unexpected situations are made from discussions with appropriate persons and job specifications and requirements.

2.9

Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.

2.10

Commissioning activities are carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.

3

Complete and report programming and commissioning activities

3.1

OHS work completion risk control measures and procedures are followed.

3.2

Work site is made safe in accordance with established safety procedures.

3.3

‘As-installed’ fire protection system is documented and an appropriate person or persons notified in accordance with established procedures.


Qualifications and Skillsets

UEENEEH164A appears in the following qualifications:

  • UEE31011 - Certificate III in Fire Protection Control
  • UEE30911 - Certificate III in Electronics and Communications
  • UEE40711 - Certificate IV in Electronics and Communications
  • UEE40811 - Certificate IV in Electrical - Fire Protection Control Systems
  • UEE50511 - Diploma of Electronics and Communications Engineering
  • UEE60211 - Advanced Diploma of Electronics and Communications Engineering

And the skillsets: