Verify compliance and functionality of instrumentation and control installations

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEENEEI112A, 'Verify compliance and functionality of instrumentation and control installations'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Verify compliance and functionality of instrumentation and control installations' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1

Prepare to inspect and test a instrumentation and control installations

1.1

OHS measures for the site are identified, obtained and understood

1.2

Established OHS risk control measures and procedures are followed in preparation for the work.

1.3

Safety hazards which have not previously been identified are noted, and established risk control measures are implemented.

1.4

Documentation or deemed to comply standard on which installation is based is reviewed and understood.

1.5

Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site

1.6

Tools, equipment and testing devices needed to verify compliance are obtained in accordance with established procedures and checked for correct operation and safety

1.7

Preparatory work is checked to ensure no damage has occurred and that work complies with requirements

2

Visually inspect the installation.

2.1

OHS risk control measures and procedures for carrying out the work are followed.

2.2

The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures.

2.3

Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures.

2.4

Instrument cabling and tubing is checked for suitability for the environments in which they are installed and suitably protected from damage.

2.5

The type and configuration/sizing of instrument cabling and tubing is confirmed as meeting that specified for the installation.

2.6

Evidence that control apparatus complies with safety and installation requirements is cited.

2.7

Marking of control apparatus is checked for accuracy and clarity and compliance with requirements.

3

Conduct functional and safety testing.

3.1

OHS risk control measures and procedures for carrying out the work are followed.

3.2

The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures

3.3

Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures.

3.4

Where process control apparatus operates at low voltage arrangements are made for an authorised person to conduct and report on all required electrical safety tests.

3.5

Insulation and continuity tests are conducted on process control cabling operating at extra-low voltage.

3.6

Process control tubing/piping is pressure tested in accordance with established practice.

3.7

Functional and test are checks are conducted on all process control apparatus in accordance with established practice.

4

Report inspection and test findings

4.1

OHS risk control work completion measures and procedures are followed.

4.2

Work site is cleaned and made safe in accordance with established procedures.

4.3

Non-compliance defects are identified and reported in accordance with established procedures.

4.4

Recommendations for rectifying defects are made in accordance with established procedures.

4.5

Verification documentation is completed in accordance with established procedures.


Qualifications and Skillsets

UEENEEI112A appears in the following qualifications:

  • UEE31211 - Certificate III in Instrumentation and Control
  • UEE42211 - Certificate IV in Instrumentation and Control
  • UEE43211 - Certificate IV in Industrial Automation and Control
  • UEE50211 - Diploma of Electrical and Instrumentation
  • UEE51011 - Diploma of Instrumentation and Control Engineering
  • UEE61111 - Advanced Diploma of Automated Systems Maintenance Engineering
  • UEE61511 - Advanced Diploma of Instrumentation and Control Engineering